How to bid in this country: portals, deadlines, thresholds →
The Pécs Fairground - design
A pécsi vásártér - tervezés — original title
Your path to submission
- Deadline: 11 November at 10:00 — 10 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
“TOP_Plusz-6.2.1-23 - Sustainable competitive urban development” program “Reconstruction and development of the Pécs Fairground function expansion project-related design program” The following legislation/standards/calls shall apply during planning and designing: • Act C of 2023 on Hungarian Architecture • Act LXIX of 2023 on the Rules of Public Works • 190/2009. (IX. 15.) on the activity of chief architect • 191/2009. (IX. 15.) on construction activities • 237/2024. (VIII. 8.) on the designation and operating conditions of construction authorities • 280/2024. (IX. 30.) on the statutes of town planning and construction requirements • 281/2024. (IX. 30.) on the procedures and controls of the construction authority • 283/2024. (IX. 30.) on architectural and urban planning councils • 176/2008. (VI. 30.) on the certification of energy performance of buildings • 9/2023. Decree No 54/2014 of…
Show full description
… 25 May 2014 of the Minister for Economy and Transport on the definition of the energy characteristics of buildings (XII. 5.) Decree of the Minister for the Interior on the National Fire Safety Regulations • Guide entitled “Assistance to the creation of equal access to public services – Complex accessibility” • 12/2022. (IV. 22.) on the Building Regulations and Regulatory Plan of the City of Pécs with County Rights • 20/2023. (VI. 26.) on the protection of the cityscape of Pécs and the operation of the local architectural and technical planning council • 316/2017. (XII.14.) - Municipal Identity Handbook adopted by the General Assembly of the Municipality of Pécs • 93/2012. (V. 10.) Government Decree authorising the construction, entry into service and termination of roads • Act I of 1988 on road transport • Technical regulations for roads in force (e-UME), in particular e-UT 03.04.13:2019 “Design of bicycle roads” - Standards e.g.: MSZ 17210, CEN/TR 17621 - Call documentation and general guide “TOP_Plusz-6.2.1-23 - Sustainable competitive urban development” Winning Tenderer performs Designer tasks under Act LXIX of 2023 on the Rules of Public Works, in the framework of which he contracts for the preparation of permit plans and construction plans, and for design foremanship during the physical implementation of the investment. It is the responsibility and responsibility of the winning Tenderer, as a general designer, to involve all specialist designers related to the development as subcontractors, to deliver the designs on time and in the quality required by the Customer, to participate in the construction procurement procedure (compilation of annexes to the public procurement documentation, answering questions arising in the course of additional information, checking tenders, participating in evaluation), and to conduct design workshops covering the period of physical implementation. • participation in the workspace handover procedure • participation in two on-site cooperations per month, based on the customer’s indication (construction time 9 months plus technical handover for the handover procedure, time available according to the law) • preparation of overlay plans related to construction design deviations/deficiencies • assessment of technical change notifications • participation in the technical handover handover procedure • issuing a designer’s declaration in case of occupancy permit · “TOP_Plusz-6.2.1-23 – Sustainable competitive urban development” program “Reconstruction and development of the Pécs Fairground function extension project-related design program” The Municipality of Pécs is committed to the well-being of the local community and the modernization of the urban infrastructure. The Pécs Fairground, which has been serving the local population and visitors for many decades, is facing a significant transformation. The area sign
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (17 awards, most recently October 2026) — the next award is due around January 2027 by that rhythm. The last award went to Mecsek Mérnökiroda Korlátolt Felelősségű Társaság.n = 17
- 4% of this buyer's awards went to companies that had already won here before (99 awards since 2018, spread over 23 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 99 awards since 2018
- 21% of awards went to companies from abroad (99 awards with a known winner country). Sector average: 6%.n = 99
- The median procedure drew 5 bids (80 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 80
- Across 11 procedures with structured selection criteria, this buyer most often required: References: services (10 of 11), Staff qualifications (10 of 11), Professional register enrolment (10 of 11), References: works (1 of 11).n = 11
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
Szakmai tevékenység végzésére vonatkozó alkalmasság előírása [Kbt. 65. § (1) bekezdés c) pont]: Alkalmatlan az Ajánlattevő (közös Ajánlattevők), ha nem rendelkezik (együttesen nem rendelkeznek): SZ.1./ GSZ legyen bejegyezve a cégnyilvántartásba vagy az egyéni … read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.1/ az Ajánlati felhívás feladásától visszafelé számított maximum 6 éven belül megkezdett és 3 éven belül az előírásoknak é… read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.2/ legalább az alábbi végzettséggel, képzettséggel rendelkező szakemberrel: M.2.1./ legalább 1 fő tervezővel, aki építésze… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Planet Concept Kft. | 2 | 2026 |
| Enrawell Consulting Korlátolt Felelősségű Társaság | 2 | 2024–2025 |
| Ex Ante Tanácsadó Iroda Korlátolt Felelősségű Társaság | 2 | 2024–2025 |
| Szedibau Építőipari Kft. | 2 | 2023–2025 |
| M Á S Design Korlátolt Felelősségű Társaság | 1 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 17 completed awards — not a statement about this procedure.)
This procedure allows 13 days between publication and deadline — typical in this country is 30 (median of 664 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,146 recorded awards) — mostly from Germany, United Kingdom, Netherlands.
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now