How to bid in this country: portals, deadlines, thresholds →
Implementation of flood protection measures of the city of Brno - Stages IX,X,XI – selection of contractor
Realizace protipovodňových opatření města Brna - Etapy IX,X,XI – výběr zhotovitele — original title
Your path to submission
- Deadline: 19 November at 10:00 — 18 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the tender is the conclusion of a contract for work according to the Contractual Conditions for the Construction of Building and Engineering Networks of Buildings Projected by the Client according to FIDIC RED BOOK, 1st edition, 1999, published in Czech translation by the Czech Association of Consulting Engineers (CACE) in 2017, and other documents constituting a contract for work. The subject of performance of the Public Contract is the construction work within the framework of the implementation of the Work, including in particular the activities pursuant to Section 4.2.4 of the Tender Documentation. A complete list of completed buildings within the framework of the Public Procurement is provided in Annex 7 of the ZD. The work is divided into the following sections: a) Section 1 – Construction objects of relocations; Section 2 – Buildings included in the project –…
Show full description
… Eligible expenditure; Section 3 – Buildings included in the project – Ineligible expenditure; d) Section 4 – Building objects included outside the project, (for details on individual Sections, see Annex 7 ZD /Technical Specification/). The Contractor will carry out construction work during the implementation of the Work, specifically the construction of flood protection measures, including the implementation of related landscaping and landscaping, under the conditions further specified in the Contract.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (91 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to HOCHTIEF CZ a. s.n = 91
- 41% of this buyer's awards went to companies that had already won here before (562 awards since 2015, spread over 181 companies). That is well below the sector norm (75%) — this buyer switches suppliers more often than others.n = 562 awards since 2015
- The median procedure drew 3 bids (480 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 480
- 95% of the bids received came from small and medium-sized enterprises (296 procedures with a bid mix). Sector: 76%.n = 296
- The award came in at a median 79% of the estimated value (66 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 66
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Michal Hrnčíř s.r.o. | 15 | 2023 |
| JANA DUDKOVÁ | 11 | 2023 |
| Dan Vrbka | 11 | 2023 |
| Ing. Petr Rovný | 11 | 2023 |
| GEODET-BRNO s.r.o. | 11 | 2023 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually 8 or more bids came in. Many compete here — price and references decide. (Based on 68 completed awards — not a statement about this procedure.)
This procedure allows 22 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Czechia · Construction work, 143 contracts went to foreign companies over the last 3 years (of 16,823 recorded awards) — mostly from Germany, Poland, France.
Submission language: Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now