Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Replacement of 4 lifts at the surgery pavilion and in-house – Vyškov Hospital

Výměna 4 ks výtahů na pavilonu chirurgie a interny – Nemocnice Vyškov — original title

CZCzechia · Vyškov - Nosálovice

Your path to submission

  1. Deadline: 30 November at 13:00 — 29 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Delivery and installation of 4 lifts and necessary services and construction work including in particular: Elaboration of project documentation for the delivery and installation of these lifts to an operational, safe and adequate execution according to the conditions specified in the tender documentation of the contract in question. Execution: • necessary building modifications of the elevator shaft and the lift engine room, • dismantling and ecological disposal of existing elevators within the scope of the tender documentation, • material securing and installation of new elevator equipment within the scope of the tender documentation of the contract in question, • electricity supply from the drinking place to the lift engine room, including a valid revision, • Security of all documents necessary to ensure the safe operation of the elevator. • Lifts and all related and related components…

Show full description

… are not and will not be classified as evacuation lifts under this contract when the completed lifts are handed over. However, the contracting authority requires that the lifts of the lift shaft and their accessories be designed, constructed and put into operation in a manner corresponding to the requirements laid down in Articles 9.6.5 and 8.10.5 of ČSN 73 0802 evacuation lifts. • Lifts must be implemented, handed over and operated in the ‘Open protocol’ mode - Prohibition of software and hardware locks (e.g. time bombs) that would block the lift over time. • Lifts must be implemented, handed over and operated in such a way as to ensure a service life of at least 15 years from the date of handover and receipt of the Lift (Work) and the contractor will ensure full availability of all spare parts, components, consumables and diagnostic elements necessary for the proper operation, maintenance, repair, revision and servicing of the Lift throughout the planned service life. The subject of the contract includes servicing, inspections and inspections necessary for operation for a period of 60 months from the handover of the completed work specified in Annex No. 3 to the contract – Warranty Service Conditions)

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeSupplies
Estimated valueCZK 6,566,000
Published28 Oct 2026
ProcedureOpen procedure
Contract period1 Jan 2027 → 20 Sept 2027
Reserved for SMEs

Type of service

42 · Industrial machinery
CPV 42416100

Clement What the numbers say about this buyer

  • 11% of this buyer's awards went to companies that had already won here before (39 awards since 2018, spread over 16 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 39 awards since 2018
  • 28% of awards went to companies from abroad (39 awards with a known winner country). Sector average: 13%.n = 39
  • The median procedure drew just one bid (28 procedures with a bid count); 57% ended with a single bidder. Sector: median 2 bids.n = 28
  • 0% of the bids received came from other countries (15 procedures with a bid mix) — all bidders, not just the winners. Sector: 11%.n = 15
  • The award came in at a median 85% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 94%.n = 8

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In comparable contracts in this sector nationwide (1,261 with a known bid count), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
AURA Medical s.r.o.32022–2025
NADOP-VÝROBA NÁBYTKU, a.s.22022–2025
MGVIVA a.s.22025
Aricoma Systems a.s.12025
SNT Plus s.r.o.12025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Monday 30 November at 13:00

Tactics

When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 1,261 completed awards — not a statement about this procedure.)

This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Czechia · Industrial machinery, 95 contracts went to foreign companies over the last 3 years (of 1,698 recorded awards) — mostly from France, Germany, Austria.

Submission language: Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now