How to bid in this country: portals, deadlines, thresholds →
Zsóry Spa and Open-air Bath Development
Zsóry Gyógy- és Strandfürdő fejlesztése — original title
Your path to submission
- Deadline: 9 November at 12:00 — 8 days left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The obsolete and degraded circular and wave pool complex is completely demolished and replaced by the formation of new pools and thematic units. The new wave pool will form the main axis of the renewable aquatic world. This is surrounded by the curved experiential and cascade pools, the pool of the “slow and fast river”, evoking the shape of the circular pool doomed to be demolished, and is also mirror-symmetrically located. The service building is located between the wave pool and the pool of the “slow and swift river” on the southern side of the complex, the exterior appearance, color and shape of which fits into the Matyó thematic concept. 1. Pools There are 7 pools in the pool group: Wave Pool - water surface: 709 m2, water depth: 0-152 cm, water temperature 28 C Seating adventure pool (cascade pool) - water surface: 166 m2, water depth: 110 cm, water temperature 32 C Standing…
Show full description
… adventure pool (cascade pool) - water surface: 149 m2, water depth: 130 cm, water temperature 32 C Adult pool - water surface: 145 m2, water depth: 135 cm, water temperature 30 C Slow and fast river - water surface: 213 m2, water depth: 135 cm, water temperature 32 C Family adventure pool - water surface: 130 m2, water depth: 110 cm, water temperature 32 C Family paddling pool and baby pool: - water surface: 120 m2, water depth: 0-40,3 cm, water temperature 32 C Between the pools 3 water experience areas were placed: Fountain Fountain Water playground - water surface: 185 m2, water depth: 0-23 cm, water temperature 30 C Additional facilities: Swimming Pool House 2. Buffet Functions developed in the Matyó Buffet Building: Die-casting, Warehouse, Refrigerated storage Sound and aromatherapy Salt cabin Accessible toilet Rotary crankcase 3. Environment Environment which includes: Traffic roads Heated area Floating blinds Building engineering of the new complex to be built as follows: - Water Supply-Channeling: The drinking water needs of the building complex are supplied from cold water wells. We plan to supply domestic hot water for the main building with separate thermal path pumps in two steps - Central heating-cooling, energy supply: The buildings are realized with the help of water obtained from thermal wells. 1. Heat exchanger performance: 1138 kW -Heating water, 2. Heat exchanger performance: 293 kW -Heating water, 3. Heat exchanger performance: 496 kW - chemicalized pool water, 4. Heat exchanger performance: 336 kW. - pool-water, utilization of the heat content of effluent thermal water with 2 water-water heat pumps -heating capacity: 481.7 kW. - Gas supply - Artificial ventilation, air technology 1 air handling unit, with internal air drying function, operated from cold water, Filtered: G4, Ventilation flow rate:1000m3/h, Fridge calorifer: tbe=18°C (te/tv=12/17°C) · The outdated and degraded circular and wave pool complex will be completely dismantled and replaced with new pools, thematic units, service facilities, and related mechanical, water engineering, electrical, building automation, environmental management and accessibility elements. The new wave pool will form the main axis of the renewable aquatic world. This is surrounded by the curved experiential and cascade pools, as well as the pool of the “slow and fast river”, evoking the shape of the circular pool doomed to demolition, in a mirror-symmetrical arrangement. The service building is located between the wave pool and the pool of the “slow and swift river”, on the southern side of the complex, whose exterior appearance, color and design fit into the Matyó thematic concept. The main elements to be dismantled in the existing pool complex affected by the development are the circular pool with a water surface of approximately 2,700 m2, the wave pool with a water surface of approximately 784 m2, and the related paved, mechanical and service elements. The area affected by the intervention is related to a pool group with an area of approximately 90 x 90 m. 1. Pools There are 7 pools in the pool group: Wave basin – water surface: 709 m2, water depth: 0-152 cm, water temperature: 28 °C. Seating adventure pool / cascade pool – water surface: 166 m2, water depth: 110 cm,
Contract
Type of service
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (12 awards since 2022, spread over 5 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 12 awards since 2022
- 33% of awards went to companies from abroad (12 awards with a known winner country). Sector average: 4%.n = 12
- 94% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 68%.n = 5
- The median procedure drew 5 bids (9 procedures with a bid count); 11% ended with a single bidder. Sector: median 5 bids.n = 9
- Across 9 procedures with structured selection criteria, this buyer most often required: References: works (8 of 9), Minimum annual turnover (6 of 9), Technical staff for execution (4 of 9), Staff qualifications (3 of 9).n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
I. a) Az ajánlattevőnek, illetve az alkalmasság igazolásában részt vevő gazdasági szereplőnek a Kbt. 67. § (1) bekezdése és a Kr. 1. § (1) bekezdése alapján az EEKD benyújtásával előzetesen (a Kr. 5-7. § szerinti szakaszban) kell igazolnia, hogy megfelel az aj… read in fullcollapse
Azon szakember(ek) ismertetése, akiket be kívánnak vonni a teljesítésbe (Kr. 21. § (2) bekezdés b) pont). Az alkalmasság igazolása tekintetében a Kbt. 69. §-a szerinti ajánlatkérői felhívásra az alábbiak szerint történik: A 321/2015. (X.30.) Korm. rendelet 21.… read in fullcollapse
P.1. A Kbt. 67. § (1)-(3) bekezdése szerint az ajánlattevő ajánlatában köteles az alkalmassági követelményeknek való megfelelés tekintetében az egységes európai közbeszerzési dokumentumba (EEKD) foglalt nyilatkozatát benyújtani. Ajánlatkérő az EEKD IV. részébe… read in fullcollapse
2) Ajánlattevő, adott esetben a kapacitást rendelkezésre bocsátó szervezet az ajánlat benyújtásakor a Kbt. 67. § (1) bekezdése szerinti nyilatkozat benyújtására köteles, mely szerint megfelel az előírt alkalmassági követelmény(ek) nek. A Kbt. 65. § (1) bek. a)… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Argus Optik Kft. | 1 | 2026 |
| Sysman Informatikai Zrt. | 1 | 2026 |
| BLUEMED Kft. | 1 | 2026 |
| "OLVISZ'98" Olajipari VÍzügyi Szolgáltató Korlátolt Felelősségű Társaság | 1 | 2026 |
| EXUM Medical Korlátolt Felelősségű Társaság | 1 | 2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,344 completed awards — not a statement about this procedure.)
This procedure allows 13 days between publication and deadline — typical in this country is 30 (median of 683 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now