Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

32/EOP/2026-"Requalification and Extension of António Gedeão High School - Feijó/Laranjeiro".

32/EOP/2026-"Requalificação e Ampliação da Escola Secundária António Gedeão - Feijó/Laranjeiro". — original title

PTPortugal · Almada

Your path to submission

  1. Deadline: 12 December at 23:59 — 42 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Portuguese.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

In this EOP it is intended to intervene with the requalification and expansion of two buildings and the construction of two new blocks; the requalification without expansion of three more buildings; the construction of a PTC with more than 250 kVA, the integral remodeling of the existing refectory and all sanitary facilities and provide the School with more classrooms and other spaces necessary for its proper functioning as educational equipment of the municipality of Almada.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€11,561,908
Published28 Oct 2026
ProcedureOpen procedure
Place of performanceAlmada
Reserved for SMEs

Type of service

45 · Construction work
CPV 45262800

Clement What the numbers say about this buyer

  • The median procedure drew 3 bids (58 procedures with a bid count); 9% ended with a single bidder. Sector: median 5 bids.n = 58
  • 46% of this buyer's awards went to companies that had already won here before (4,299 awards since 2012, spread over 1,482 companies). 54% went to new names.n = 4,299 awards since 2012
  • 57% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 84%.n = 5
  • The award came in at a median 89% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 13
  • Not one of the 4,299 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 4,299

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Portuguese.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Grupo 8 - Vigilância e Prevenção Eletrónica, SA282012–2023
Warpcom Services, S.A.262012–2026
SOPSA ECO - INNOVATION, SA212012–2026
CLARANET II SOLUTIONS, S.A.202014–2026
CONTENUR PORTUGAL - INDÚSTRIA E COMERCIO DE MATERIAIS PLASTICOS S.A192012–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

6
2024
2
2025
6
2026
14 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Saturday 12 December at 23:59

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,018 completed awards — not a statement about this procedure.)

This procedure allows 46 days between publication and deadline — typical in this country is 29 (median of 559 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Portugal · Construction work, 16 contracts went to foreign companies over the last 3 years (of 1,051 recorded awards).

Submission language: Portuguese.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Portuguese
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now