How to bid in this country: portals, deadlines, thresholds →
ENLJ-SOP-326/26 - Supply of materials for carrying out mechanical works on the client's pipeline network by lots
ENLJ-SOP-326/26 - Dobava materiala za izvajanje strojnih del na plinovodnem omrežju naročnika po sklopih — original title
Your path to submission
- Deadline: 11 November at 10:00 — 10 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Slovenian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Supply of materials for carrying out mechanical works on the client's pipeline network in the following sections: Lot 1: Locking fittings: overhead installation Lot 2: House gas glands 3rd set: Locking fittings and insulating elements: Underground installation Lot 4: Steel/PE transition pieces Lot 5: Fason pieces for PVC pipes 6th set: Seasonal pieces for PVC pipes made of stainless steel 7th assembly: Seasonal pieces for PVC pipes - necklaces 8th set: Seasonal ballooning cuts Lot 9: Fason pieces for PE pipes 10th set: PE Pipe 11th assembly: Cabinets for main gas shut-off pipe 12th assembly: Passive insulation of steel pipes and pipeline marking strips Road caps 14th lot: Pipeline fittings marking plates Lot 15: Spare parts - SCHUCK 16th lot: Spare parts - RMA 17th set: Spare parts - FRIATEC 18th lot: Spare parts - GEORG FISCHER 19th lot: Spare parts - PVC spacers · Supply of materials…
Show full description
… for carrying out mechanical works on the client's pipeline network for Lot 1: Locking fittings: overhead installation · Supply of materials for carrying out mechanical works on the client's pipeline network for Lot 2: House gas inlets · Supply of materials for carrying out mechanical works on the client's gas pipeline network for Lot 3: Locking fittings and insulating elements: Subterranean installation · Supply of materials for carrying out mechanical works on the client's pipeline network for Lot 4: Steel/PE transition pieces · Supply of materials for carrying out mechanical works on the client's pipeline network for Lot 5: Fason pieces for PVC pipes · Supply of materials for carrying out mechanical works on the client's pipeline network for Lot 6: Fason pieces for PVC pipes made of stainless steel · Supply of materials for carrying out mechanical works on the client's pipeline network for Lot 7: Fason pieces for PVC pipes - necklaces · Supply of materials for carrying out mechanical works on the client's pipeline network for Lot 8: Seasonal ballooning cuts
Contract
Type of service
Clement What the numbers say about this buyer
- 8% of this buyer's awards went to companies that had already won here before (230 awards since 2017, spread over 50 companies). That is well below the sector norm (38%) — this buyer switches suppliers more often than others.n = 230 awards since 2017
- The median procedure drew just one bid (208 procedures with a bid count); 76% ended with a single bidder. Sector: median 3 bids.n = 208
- The award came in at a median 98% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 81%.n = 21
- 19% of awards went to companies from abroad (230 awards with a known winner country). Sector average: 6%.n = 230
- 12% of the bids received came from other countries (69 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 69
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovenian.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| BEMIJA d.o.o., izdelava in montaža jeklenih konstrukcij, Ljubljana | 3 | 2025–2026 |
| ENERKON zastopanje, inženiring, proizvodnja, trgovina, d.o.o. | 3 | 2024–2025 |
| CVIBLJE - kovinarstvo in vzdrževalna dela Miha Višček s.p. | 3 | 2024–2026 |
| M & K SEIBERT, zunanja trgovina in zastopanje, d.o.o. | 2 | 2024–2026 |
| Activ Project Management GmbH | 2 | 2025–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 31 (median of 368 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Slovenia · Construction materials, 15 contracts went to foreign companies over the last 3 years (of 300 recorded awards).
Submission language: Slovenian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now