How to bid in this country: portals, deadlines, thresholds →
Renovation of Tölgyes Street
Tölgyes utca felújítása — original title
Your path to submission
- Deadline: 20 November at 12:00 — 20 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Tölgyes utca road renovation, pavement construction and rainwater drainage: Planned quantities: - total length of the planned trip: 1078,58 m - designed pavement length: 1135 m - 4.373 m2 mirror making - 1.579 m2 bench arrangement - 400 m2 slope formation - 1.137.5 m2 excavation - 218.2 m3 macadam system roadway and mechanical stabilization demolition - 55 m recessed edging or running line making - 1.226 m classic edging - 44.7 m2 paving for heavy use - 4.093 m3 asphalt top layer milling - 230.66 m3 rolled asphalt base layer with AC22 base (N) 35/50, AC22 base (N) 50/70 bitumen, - 140 m3 balancing layer with AC11 wear 50/70, AC11 wear 70/100 bitumen - 349.87 m3 rolled asphalt wear layer with AC11 wear (N) 50/70, AC11 wear (N) 70/100 bitumen B.VI. Network function: d Environmental condition: B Design speed: 30 km/h The crown width of the planned road renovation is 9.00m. The widening to…
Show full description
… 6.00m is carried out with a one-sided fall of 2.5% to the south in the direction of the planned stormwater canal. Tölgyes utca branches down from Csongor utca to the right. At the same time as the branch on Tölgyes Street, the section of Csongor Street with the affected pavement, which is about 50.0 m long, will also be renovated. The road to be renovated crosses the Érpataki VIII. main stream (hrsz. 0301) in the 0+203.5 km section with a bridge in the 5+875 km section of the main stream. The width of the bridge is 9.50 m, and the width between the sidewalks is 7.00 m. In the north side of the street, a 1.50 m wide sidewalk is also created along the plot boundaries. The widening of the pavement from the 0+000 km section to the intersection of the Érpataki VIII.- main stream is on both sides, henceforth the road expands mainly towards the forest in the south direction. Tactile pavements shall be installed in front of road connections of pavement sections by the installation of a conductive lane of 1,5 m x 0,3 m and a warning signal of 0,6 m x 1,5 m. The installation of elements for speed reduction in the sections 0+100, 0+450 and 0+800 km is planned, taking into account the design guide “Attenuation of road traffic” issued by the Hungarian Road Transport Association. The renovation and widening of the planned road will require the construction of a closed rainwater canal on the street. The trail of the closed rainwater drainage channel is planned in the trail of the existing gravitational and desiccating trench sections, so they will be dismantled and filled. The receiver of the closed precipitation canals is the existing connection points of the main stream Érpataki VIII crossing the street. The D 300 KG-PVC channel was designed from the western direction on a length of about 187.8 m from the existing sinkhole M27 and the D 400 KG-PVC channel from the eastern direction on a length of 729 m. At the receiver, the existing 12-metre-long ø 40 concrete channel section is to be rebuilt on D 400 KG-PVC pipe due to changes in level connection. Opposite Sikló Street, the drying pool in the forest is still connected to the drainage system. Once the construction is complete, this desiccant pool must also be cleaned and restored to its original condition. The fall of the eastern channel section D400 KG-PVC is 1.1 ‰. The replacement of electric poles, electrical cabinets, low-current and earth cables and the relocation of hydrants in the structure gauge of the planned road and pavement are part of the investment. Detailed and itemised quantities and detailed technical parameters, as well as the details and detailed characteristics of the task to be performed by the successful tenderer and the detailed technical requirements are set out in the procurement document. The contracting authority draws the attention of T. Tenderers to the fact that if the invitation or the documentation provided contains a reference to a specific make, origin, type of thing, procedure, activity, patent or trademark, the designation was made only in order to unambiguously determine the nature of the object, and whether or not it is listed next to the designation, the contracting authority – the Public Procurement Act. 321/2015 referred to in Section 58(4). (X.30.) Government
Contract
Type of service
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (72 awards since 2018, spread over 15 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 72 awards since 2018
- In this sector the buyer awards roughly every 5 months (9 awards, most recently August 2026) — the next award is due around February 2027 by that rhythm. The last award went to TÖMB 2002 Szolgáltató Korlátolt Felelősségű Társaság.n = 9
- The median procedure drew 4 bids (63 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 63
- 11% of awards went to companies from abroad (72 awards with a known winner country). Sector average: 4%.n = 72
- 82% of the bids received came from small and medium-sized enterprises (18 procedures with a bid mix). Sector: 68%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.
What you must prove — eligibility criteria
A kiválasztási szempontok felsorolása és rövid ismertetése (irányadó az M.2. alkalmassági minimumkövetelménynél is): A 321/2015. (X. 30.) Korm. rendelet 1.§ (1) bekezdése alapján az ajánlattevőnek az ajánlatának benyújtásakor az egységes európai közbeszerzési … read in fullcollapse
M.2. Az alkalmassági minimumkövetelményt ajánlattevő a Kbt. 65. § (1) bekezdés b) pontja és a Kr. 21. § (2) bekezdés b) pontja szerint köteles igazolni, azoknak a szakembernek - különösen a minőség ellenőrzésért felelőseknek - a megnevezése és M2. szerinti poz… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| KE-VÍZ 21 Építőipari zártkörűen működő Részvénytársaság | 3 | 2024–2026 |
| Mészáros és Mészáros Ipari, Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság | 2 | 2024–2025 |
| MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság | 1 | 2025 |
| ZEMPLÉNKŐ Kelet-magyarországi Építőipari Fővállalkozó és Bányászati Korlátolt Felelősségű Társaság | 1 | 2025 |
| OPUS TITÁSZ Áramhálózati Zártkörűen Működő Részvénytársaság | 1 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 9 completed awards — not a statement about this procedure.)
This procedure allows 25 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now