How to bid in this country: portals, deadlines, thresholds →
Aid projects in the substation of the substation of Kallistiriou, Agia and Lamia
Έργα Ενίσχυσης στους Υ/Σ ΥΤ/ΜΤ Καλλιστηρίου, Αγιάς και Λαμίας — original title
Your path to submission
- Deadline: 8 December at 13:00 — 37 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Greek.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject of the contract is the implementation of the following project: ‘Aid projects in the submarines of Kallistiriou, Agia and Lamia’. (CPV: 45232221, DA17-2, , 45315400, 45315500, 31174000, 31682300). The project includes the following aid projects, hereinafter referred to as sub-projects: Subproject A: Increase of the Kallistiriou Substance with 3rd M/S Power 150/20kV, and in more detail: - addition of a , M/S Power Portal - connection of 150/20kV M/S Power (M/S No3) , 40/ 50MVA with HV and MT, - extension of the MT side, with the addition of eight (8) new OLM MT Departure Tables, one (1) MT Arrival Table of M/S Type MM, one (1) set of MT BRM/BSM scales interconnection tables and one (1) AD scale configuration table, if required, - expansion of HEDNO's IEC61850 network and inclusion of new MTs in DSE DEDDIE. Subproject B: Increasing the Agia Substation with a 2nd M/S 150/20kV,…
Show full description
… and in more detail: - addition of YT Power M/S Gate, - supply and installation, addition of 150/20kV Power M/S (M/S No2), 40/50 MVA, - extension of the MT side, with the addition of eight (8) new OLM MT Departure Tables, one (1) MT Arrival Table of M/S Type MM, one (1) set of MT BRM/BSM scale interconnection tables, one (1) MT Table of CM type compensation capacitors and one (1) AD type scale configuration table, if required. - addition of a complex of compensating capacitors, - upgrade of the existing control and protection equipment under the responsibility of HEDNO and ADMIE, - implementation of a new communication network under IEC-61850 and installation of a new PSO under the responsibility of HEDNO, - implementation of a new communication network under IEC-61850 and installation of a new PSO under the responsibility of ADMIE . Subproject C: Increase of the Substation of Lamia with 3rd M/S 150/20 kV, and in more detail: - addition of HV Power M/S Gate, - renovation and extension of HV Balance Protection D/F system, - supply and installation of , addition of 150/20 kV Power M/S (No3), 40/50 MVA, - extension of the outdoor MT side, with the addition of eight (8) new MT OLM departure gates, one (1) M/S MT arrival gate, one (1) MT BSM scale interconnection gate and one (1) CM compensation capacitor gate. - addition of a compensating capacitor assembly, - implementation of a new communication network according to IEC-61850 and installation of PDSS under the responsibility of HEDNO. Inclusion of the PMSPs of the new HS portal and the new MT portals under the responsibility of HEDNO. 1. The project will be carried out on the above-mentioned subsystems of the Interconnected System, which are in operation, so increased protection measures should be taken during the execution of the works, but also the required isolations of the equipment in operation should be planned correctly and in a timely manner. · The execution and completion of the individual sub-projects will be done in a specific order indicated in the . contract documents The scope of the project includes the preparation of the required studies, the construction of the necessary civil engineering works, the supply of all the necessary materials / equipment, their construction / installation on the respective subsystems and their activation / electricity after the necessary checks and tests. In addition, as part of the project, the corresponding works for the extension of the IPTO , system will be carried out in accordance with the provisions of the technical and commercial documents of the Declaration.
Contract
Type of service
Clement What the numbers say about this buyer
- 12% of this buyer's awards went to companies that had already won here before (159 awards since 2021, spread over 52 companies). That is well below the sector norm (65%) — this buyer switches suppliers more often than others.n = 159 awards since 2021
- In this sector the buyer awards roughly every 4 months (3 awards, most recently April 2026) — by that rhythm the next award was due around July 2026. The last award went to ΤΕΡΝΑ ΑΝΩΝΥΜΗ ΤΕΧΝΙΚΗ ΤΟΥΡΙΣΤΙΚΗ ΚΑΙ ΝΑΥΤΙΛΙΑΚΗ ΕΤΑΙΡΕΙΑ.n = 3
- 13% of awards went to companies from abroad (159 awards with a known winner country). Sector average: 0%.n = 159
- The median procedure drew 2 bids (146 procedures with a bid count); 49% ended with a single bidder. Sector: median 1 bid.n = 146
- The award came in at a median 79% of the estimated value (38 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 38
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Τεχνική και επαγγελματική ικανότητα α. Να έχει μελετήσει και κατασκευάσει κατά την τελευταία δεκαετία τουλάχιστον δύο (2) έργα Υ/Σ με εξοπλισμό ΥΤ ονομαστικής τάσης 132kV ή μεγαλύτερης και πιο συγκεκριμένα: αα. Να έχει μελετήσει και κατασκευάσει νέους Υποσταθμ… read in fullcollapse
Οι προσφέροντες πρέπει να διαθέτουν την απαιτούμενη οικονομική- χρηματοοικονομική επάρκεια και συγκεκριμένα μέσο ετήσιο κύκλο εργασιών κατά την τελευταία τριετία οκτώ εκατομμυρίων ευρώ (8.000.000 €) κατ’ ελάχιστο. Για επιχειρήσεις που λειτουργούν για χρονικό δ… read in fullcollapse
Καταλληλότητα άσκησης επαγγελματικής δραστηριότητας Οι οικονομικοί φορείς που συμμετέχουν στη διαδικασία σύναψης της παρούσας σύμβασης απαιτείται να ασκούν δραστηριότητα συναφή με το αντικείμενο της σύμβασης. Οι οικονομικοί φορείς που είναι εγκατεστημένοι σε κ… read in fullcollapse
Tender documents — direct download
Contracting authority contact
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 43 days between publication and deadline — typical in this country is 34 (median of 2,398 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Greece · Construction work, 132 contracts went to foreign companies over the last 3 years (of 55,142 recorded awards) — mostly from Italy, Germany, Albania.
Submission language: Greek.