Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Connection of road II/312 to D35 MÚK Vysoké Mýto – West – Stage I and II

Napojení silnice II/312 na D35 MÚK Vysoké Mýto – západ – I. a II. etapa — original title

CZCzechia · Pardubice - Doubravice

Your path to submission

  1. Deadline: 2 December at 08:00 — 30 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the Public Contract consists of Fulfilment A and Fulfilment B for the purposes of the material, price and contractual breakdown. The Contractor is obliged to submit a single offer for both services. The procedure will result in the selection of a single contractor and the conclusion of two interrelated contracts. The subject of Fulfilment A is a new road construction connecting the existing II/312 road with the newly built D35 motorway. The public contract will include the construction of a new road, the relocation of existing Class II and III roads, local and special-purpose roads and the relocation of an existing cycle path. The construction also includes a new circular intersection, the implementation of culverts, the construction of new bridge structures relocation of water supply, sewerage, gas pipeline and telecommunications networks and the implementation of public…

Show full description

… lighting. It also includes the provision of the necessary transport and engineering measures and replacement plantings. The subject of Fulfilment B is SO 002 – aftercare for greenery. For this part of the Public Contract, the Contracting Authority shall conclude a separate contract with the selected supplier. The contracting authority concludes a separate contract for Fulfilment A with the selected supplier and a separate contract for Fulfilment B. By submitting a tender, the supplier accepts the obligation to conclude both of the above-mentioned contracts if it is selected. A detailed description of the subject Fulfilment A is given in the Technical Specification, Drawings, Forms and Contractual Conditions, which form an annex to these Tender Documents. A detailed description of the subject of Fulfilment B is given in the Contract for the Provision of Services – Aftercare, Project Documentation and List of Works, which form an annex to these tender documents. The project documentation and the Work List are common to Fulfilment A and Fulfilment B. The relevant part of these documents shall be used for each of the contracts.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valueCZK 698,348,666
Published26 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work77 · Agricultural services
CPV 45221110 · 45231000 · 45233120 · 45233142 · 45233290 · 45316100 · 77310000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 13 months (8 awards, most recently November 2025) — the next award is due around December 2026 by that rhythm. The last award went to Chládek a Tintěra, Pardubice a.s.n = 8
  • 56% of this buyer's awards went to companies that had already won here before (373 awards since 2015, spread over 55 companies). That is well below the sector norm (75%) — this buyer switches suppliers more often than others.n = 373 awards since 2015
  • The median procedure drew 2 bids (334 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 334
  • The award came in at a median 91% of the estimated value (22 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 22
  • 3% of awards went to companies from abroad (373 awards with a known winner country). Sector average: 7%.n = 373

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
MANIFOLD GROUP s.r.o.312021–2025
Contract management, a.s.182021–2025
Autopneu Urban s.r.o.152022–2026
DSP a.s.132021–2025
ČEPRO, a.s.132022–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2022
21
2024
17
2025
8
2026
48 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Wednesday 2 December at 08:00

Tactics

When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 5 completed awards — not a statement about this procedure.)

This procedure allows 37 days between publication and deadline — typical in this country is 32 (median of 1,073 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Czechia · Construction work, 150 contracts went to foreign companies over the last 3 years (of 17,313 recorded awards) — mostly from Germany, Poland, France.

Submission language: Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now