Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

MVE Libštejnský mlýn

CZCzechia · Plzeň

Your path to submission

  1. Deadline: 6 November at 18:00 — 5 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Complete construction of the building MVE Libštejnský mlýn incl. delivery of technology, consisting mainly of: - construction work consisting in the construction of a complete construction of a waterworks – small hydroelectric power plant (MVE) incl. inlet building, incl. modifications of the supply channel (drive), incl. repairs of the driveway to the extent necessary for construction site transport, - supply and installation of MVE technology incl. commissioning in parallel with DS ČEZ (UPOS, UTP), - supply and installation of power outlet of the MVE at the level of 22 kV incl. dry transformer with reduced losses and HV switchboard.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerMVE Libštejnský mlýn, s.r.o.
TypeWorks
Estimated valuevalue not published
Published26 Oct 2026
ProcedureOpen procedure
Contract period16 Nov 2026 → 30 Jun 2028
EU-fundedReserved for SMEs

Type of service

45 · Construction work42 · Industrial machinery
CPV 45251120 · 42112210 · 45315200
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Contracting authority contact

·
Deadline — Friday 6 November at 18:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 15,064 completed awards — not a statement about this procedure.)

This procedure allows 12 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Czechia · Construction work, 143 contracts went to foreign companies over the last 3 years (of 16,823 recorded awards) — mostly from Germany, Poland, France.

Submission language: Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one