How to bid in this country: portals, deadlines, thresholds →
Refurbishment and extension of SOE Building C
SOE "C" épület átalakítása és bővítése — original title
Your path to submission
- Deadline: 2 November at 14:00 — 1 day left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The contracting authority (AK) intends to carry out the transformation, extension and comprehensive reconstruction (high-rise construction activity) of the existing building C at 9400 Sopron, Bajcsy-Zsilinszky u. 4, on the property located in the inner area with topographical number 7183. The tasks of the work in one phase include, among others, levelling on the 2nd floor with a purely wooden support structure (CLT and laminated wood), complex accessibility of the entire building (passenger lift, barrier-free ramp and toilets), renovation of the façade and roof structure, and the complete construction of building engineering (heating, cooling, ventilation, water and sewerage systems) and building electrical systems, together with related demolition works. Continuation of field BT-24 due to character limitation: AK for 321/2015. Pursuant to Section 46(3) of Government Decree No 273/2007…
Show full description
… of 30 October 2007, it is stipulated that the reference to a product, origin, type, process, activity, person, patent or trade mark of the make, origin, type specified in the notice launching the procedure, the documentation and the technical documentation was made only in order to clearly determine the nature of the object, and the term ‘or equivalent’ is to be understood. Proof of equivalence is the responsibility of the AT. Continuation of field BT-77 due to character limitation: AK shall stipulate in the contract to be concluded with the winning AT, for the duration of the performance and for the duration of the warranty, the guarantees and the ancillary obligations providing for the contract confirming the following contract: Warranty obligation: AT is obliged to provide a full warranty for a minimum period of 60 (sixty) months from the end of the technical handover. The warranty obligation starts from the full completion of the technical handover procedure. Performance guarantee: AK shall provide a security equal to 5 % of the (net) contractor’s fee excluding reserve and VAT as security for claims relating to non-performance of the contract. Warranty guarantee: AK shall lodge a security equal to 5 % of the (net) contractor’s fee, excluding reserve and VAT, as security for claims relating to the defective performance of the contract. The successful AT shall provide the guarantee if the performance guarantee has been released or has expired by the contracting authority. The warranty guarantee can be provided according to the choice of the AK. in the form specified in Section 134(6)(a). The detailed conditions are set out in the draft contract issued as part of the KD. Late penalty: If the winning AT fails to meet the deadline for performance specified in the contract for a reason for which it is responsible, AK shall be entitled to enforce a default penalty against the winning AT. The default penalty to be paid in case of late performance is 1 % of the difference between the net consideration without reserve and the works certified by the technical inspector (part of the work affected by the delay), but not less than HUF 100,000 per day, with the proviso that the total amount of the default penalty imposed on the winning AT may not exceed 20 % of the net contractor’s fee without reserve. The penalty is based on the net consideration. Incorrect performance penalty: In the event that the winning AT fails to fulfil its warranty and guarantee obligations under the contract, AK may enforce a defective performance penalty claim or a claim for damages in excess of the penalty. The default penalty shall be 1 % (i.e. one per cent) of the total net contractor’s fee without reserve, for each part of the work affected by the default, but not more than 20 % of the net contractor’s fee without reserve. In the event of a contract failure, AK may enforce a default penalty against the winning AT. Failure shall mean, in particular, the impossibility under the responsibility of the winning AT, as well as the termination or withdrawal with immediate effect based on the breach of contract by the winning AT. The Failure Penalty is
Contract
Type of service
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (28 awards since 2019, spread over 13 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 28 awards since 2019
- The median procedure drew 3 bids (23 procedures with a bid count); 39% ended with a single bidder. Sector: median 5 bids.n = 23
- 21% of awards went to companies from abroad (28 awards with a known winner country). Sector average: 4%.n = 28
- 90% of the bids received came from small and medium-sized enterprises (13 procedures with a bid mix). Sector: 68%.n = 13
- Across 4 procedures with structured selection criteria, this buyer most often required: Financial ratio required (4 of 4), References: works (3 of 4), Minimum number of managers (3 of 4), Professional register enrolment (3 of 4).n = 4
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
SZ/1. A közbeszerzés tekintetében az építőipari kivitelezési tevékenységet végző gazdasági szereplők vonatkozásában a Kbt. 65. § (1) bekezdésének c) pontja és a 321/2015. (X. 30.) Korm. rendelet 26. § (1) bekezdésének a) pontja alapján a magyarországi letelepe… read in fullcollapse
P/1. Ajánlattevő 321/2015. (X. 30.) Kr. 1. § (1) bekezdése alapján ajánlattevőnek az ESPD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajánlatkérő e körben elfogadja az érintett gazdasági szereplő egyszerű nyilatkoza… read in fullcollapse
P/2. Ajánlattevő 321/2015. (X. 30.) Kr. 1. § (1) bekezdése alapján ajánlattevőnek az ESPD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajánlatkérő e körben elfogadja az érintett gazdasági szereplő egyszerű nyilatkoza… read in fullcollapse
M/1. Ajánlattevő 321/2015. (X. 30.) Kr. 1. § (1) bekezdése alapján ajánlattevőnek az ESPD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajánlatkérő e körben elfogadja az érintett gazdasági szereplő egyszerű nyilatkoza… read in fullcollapse
M/2. AT 321/2015. (X. 30.) Kr. 1. § (1) bekezdése alapján ajánlattevőnek az ESPD benyújtásával kell előzetesen igazolnia, hogy megfelel az alkalmassági követelményeknek. Ajánlatkérő e körben elfogadja az érintett gazdasági szereplő egyszerű nyilatkozatát, azaz… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| SDA Informatika Zártkörűen Működő Részvénytársaság | 1 | 2024 |
| SMP Solutions Zrt. | 1 | 2024 |
| Lumen Multimédia Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 1 | 2024 |
| Unicam Magyarország Kft. | 1 | 2025 |
| Bechtle direct Korlátolt Felelősségű Társaság | 1 | 2024 |
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,344 completed awards — not a statement about this procedure.)
This procedure allows 12 days between publication and deadline — typical in this country is 30 (median of 683 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now