How to bid in this country: portals, deadlines, thresholds →
Complex renovation of municipal apartments / 2026.
Önkormányzati lakások komplex felújítása / 2026. — original title
Your path to submission
- Deadline: 16 November at 11:00 — 15 days left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Within the framework of a framework construction contract Budapest Capital XIII. Carrying out maintenance, refurbishment, extension, fault and hazard prevention and energy modernisation works of apartments and non-residential premises owned by the district municipality in a net envelope of HUF 275 000 000 / 12 months. In the event of an extension of the framework contract, the envelope for the baseline period shall also be increased in proportion to the duration of the extension. The Contracting Authority undertakes to call on 70% of the envelope under the baseline period and the extended period, and the Contracting Authority is entitled to unilaterally enforce a quantitative deviation of -30% and +10% from the envelope during the duration of the contract. The contractor as tenderer shall be responsible for carrying out all professional construction work, in particular, but not limited…
Show full description
… to: master builder and related work (structural construction, masonry, dry construction, carpentry, cladding, locksmith, painting-glazing, etc.); building engineering, heating installation and ancillary works (gas design, MEO and chimney sweep expert opinion, etc.); replacement and ancillary work on doors and windows; electrical installation and its ancillary works, as well as contact protection measurement, - on a case-by-case basis - possible reworking and permitting of the plans prepared for certain investment works, and participation in obtaining the permit for the use of the completed works. Data relevant to the expected level of performance (quantities of the previous period): - Year 2024: 6 apartments with a total of 376 m2; - Year 2025: 6 apartments with a total of 366 m2; - Year 2026: 13 apartments, a total of 697 m2. The contracting authority also plans the quantities of the previous period for the present public procurement procedure, i.e. with an average of 8 apartments per year and a total of 479 m2. The current list of properties outside the 13th district can be found in the technical specifications that are part of the procurement documents. The list of properties included in the performance is indicative. Orders from the framework contract shall take the form of specific agreements for which the Contracting Authority shall provide a reserve of 10 % as specified in the framework contract. During the ordering process, the contractor must compile a priced budget for the specific task with the material prices of the offered overhead hourly rates and the TERC budgeting program in force at the time of the ordering; in this context, the TERC standard times shall not be changed. The customer may exercise the right of material selection if he does not accept the material price or material quality indicated in the priced budget of the order, or if special material is required during the selection that is not included in the database of the TERC program; the right to designate materials includes the indication of the specific product and the determination of its maximum value that can be accounted for on the basis of its realistic market price. If the customer exercises his right of material assignment, the contractor is entitled to charge a ‘material handling cost’ of up to 5 % of the consideration for the material selected by the customer, which includes the costs of acquisition, loading and transport. In its individual order, the contracting authority is also entitled to order the construction task together with planning, which the contracting authority also indicated among the CPV codes (71200000-0). The detailed terms of the order are set out in the draft framework contract, which forms part of the procurement documents. Technical specifications forming part of procurement documents shall not refer to goods of a particular make or origin or to a particular process characterising the products or services provided by a particular economic operator, or to trade marks, patents, activities, persons, types or a particular origin or manufacturing process, if this would result in favouring or eliminating certain economic operators or products. If the contracting authority extends the duration of the framework contract by a further 12 months, the envelope for the baseline period shall also be increased in proportion to the duration of the extension.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (9 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to Nimród-Bau Beruházó és Kivitelező Kft.n = 9
- 19% of this buyer's awards went to companies that had already won here before (69 awards since 2018, spread over 24 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 69 awards since 2018
- The median procedure drew 3 bids (62 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 62
- 12% of awards went to companies from abroad (69 awards with a known winner country). Sector average: 4%.n = 69
- 82% of the bids received came from small and medium-sized enterprises (37 procedures with a bid mix). Sector: 68%.n = 37
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
SZ/1. Ajánlatkérő ellenőrzi a Magyar Kereskedelmi és Iparkamara által vezetett ON-LINE Építőipari Kivitelezői Nyilvántartásban a kivitelezők közötti szereplését. Nem Magyarországon letelepedett gazdasági szereplő esetén ajánlattevő a 321/2015. (X. 30.) Korm. r… read in fullcollapse
M/1. Ajánlattevő a 321/2015. (X. 30.) Korm. rendelet 21. § (2) bekezdés a) pontjára tekintettel köteles a Kbt. 69. § (4)-(7) bekezdéseinek alkalmazása esetén benyújtani az eljárást megindító felhívás feladásától visszafelé számított öt évben befejezett, de leg… read in fullcollapse
M/2. Ajánlattevő a 321/2015. (X. 30.) Korm. rendelet 21. § (2) bekezdés b) pontjára tekintettel köteles a Kbt. 69. § (7) bekezdés második fordulata alapján ajánlatában benyújtani azon szakembereknek (szervezeteknek) megnevezését, képzettségük és szakmai tapasz… read in fullcollapse
SZ/2. Ajánlatkérő ellenőrzi az ajánlattevő (alkalmasságot igazoló) a Magyar Építész Kamara, illetve a Magyar Mérnöki Kamara által vezetett nyilvántartásokban való szereplését. Nem Magyarországon letelepedett gazdasági szereplő esetén ajánlattevő a 321/2015. (X… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| MVM Next Energiakereskedelmi Zrt. | 5 | 2024–2025 |
| Nimród-Bau Beruházó és Kivitelező Kft. | 4 | 2025–2026 |
| Zacc Építésziroda Korlátolt Felelősségű Társaság | 3 | 2023–2024 |
| Ferencz-ker Szolgáltató Korlátolt Felelősségű Társaság | 2 | 2026 |
| Jánosik és Társai Ipari, Szolgáltató és Karbantartó Korlátolt Felelősségű Társaság | 2 | 2025–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 9 completed awards — not a statement about this procedure.)
This procedure allows 26 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now