How to bid in this country: portals, deadlines, thresholds →
Development of a district heating system in Kaban
Távhőszolgáltatási rendszer kialakítása Kabán — original title
Your path to submission
- Deadline: 3 November at 11:00 — 2 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Development of a district heating system for public institutions using geothermal energy in the administrative area of the city of Kaba as follows: Energy development of Kaba Spa with new thermal well drilling and thermal heat utilization for public buildings by building a district heating pipeline network and heat center. The construction of a new thermal well in Kaba and the provision of heat supply to public institutions through the installation of transmission lines and heat recovery systems with the help of the thermal water produced by the thermal well. Installation of an open well house in a prefabricated design with the construction of a pump house and well engineering. Installation of power lines (pre-insulated flexible pipelines) in public areas, in deep-laying, with a length of 1265 m, regardless of size. Connecting to the installed new thermal well and the transmission line,…
Show full description
… and then supplying district heating to several municipal institutions on the transmission line after the heat has been utilised. It supplies district heating to the following municipal institutions on the transmission line: - Workers' hostel: 4183 Kaba, Hrsz: 1671, which is connected to the network by a pair of wires mounted in a common jacket tube through a 302 fm pre-insulated plastic flexible wire pair ridge. - New Nursery: 4183 Kaba, Hrsz: 1676, which is connected to the main spine by 77 fm by a pair of wires mounted in a common jacket tube. - Daycare Cuisine: 4183 Kaba, Rr.: 1688, which is connected to the network by a pair of wires mounted in a common jacket tube through a 45 fm pre-insulated plastic flexible wire pair ridge 46 fm. - Seven Color Flower Kindergarten: 4183 Kaba, Hrsz: 2141, which is connected to the main spine by a pair of wires mounted in a common jacket tube at 196 fm. - Fire brigade: 4183 Kaba, Hrsz: 1677/1, which is connected to the main spine by a pair of wires mounted in a common jacket tube at 54 fm. - Sunshine Kindergarten: 4183 Kaba, Rr.: 186/1, connected to the main spine by 120 fm by a pair of wires mounted in a common jacket tube. - Support Social Basic Service Center new wing: 4183, Kaba, Hrsz: 4, which extension building will not have a separate heat recovery block installed, but will be supplied from the old building unit at the same address with secondary power supply. The starting point of the supply starts from the heat recovery block on the ground floor of the old building, the arrival point of the pair of wires is the boiler room on the upper floor of the extension. · Development of a district heating system for public institutions using geothermal energy in the administrative area of the city of Kaba as follows: Energy development of Kaba Spa with new thermal well drilling and thermal heat utilization for public buildings by building a district heating pipeline network and heat center. Thermal heat recovery block with a heat output of 300 kW to be installed next to the open thermal well, the heat produced by which is supplied by district heating to the following municipal institutions: - Workers' hostel: 4183 Kaba, Hrsz: 1671, which is connected to the network by a pair of wires mounted in a common jacket tube through a 302 fm pre-insulated plastic flexible wire pair ridge. - New Nursery: 4183 Kaba, Hrsz: 1676, which is connected to the main spine by 77 fm by a pair of wires mounted in a common jacket tube. - Daycare Cuisine: 4183 Kaba, Rr.: 1688, which is connected to the network by a pair of wires mounted in a common jacket tube through a 45 fm pre-insulated plastic flexible wire pair ridge 46 fm. - Seven Color Flower Kindergarten: 4183 Kaba, Hrsz: 2141, which is connected to the main spine by a pair of wires mounted in a common jacket tube at 196 fm. - Fire brigade: 4183 Kaba, Hrsz: 1677/1, which is connected to the main spine by a pair of wires mounted in a common jacket tube at 54 fm. - Sunshine Kindergarten: 4183 Kaba, Rr.: 186/1, connected to the main spine by 120 fm by a pair of wires mounted in a common jacket tube. - Support Social Basic Service Center new wing: 4183, Kaba, Hrsz: 4, which extension building will not have a separate heat recovery block installed, but will be supplied from the old building unit at the same address with secondary power supply. The starting point of the supply starts from the heat recovery block on the ground floor of the old building, the arrival point of the pair of wires is on the upper floor of the extension
Contract
Type of service
What you must prove — eligibility criteria
Az alkalmasság minimumkövetelménye(i): P.1.) Alkalmatlan az ajánlattevő, ha az ajánlattevőnek a közbeszerzés tárgyából (kivitelezési munkálatok) származó nettó árbevétele nem éri el a felhívás feladásától visszafelé számított utolsó három mérlegfordulónappal l… read in fullcollapse
Az alkalmasság minimumkövetelménye(i): M.1.) Ajánlattevő alkalmatlan a szerződés teljesítésére, ha nem rendelkezik az ajánlati felhívás feladásának napjától visszafelé számított 5 évben – a 321/2015. (X.30.) Korm. rendelet 21. § (2a) bekezdés a) pontjára figye… read in fullcollapse
Az alkalmasság minimumkövetelménye(i): M.2.) Ajánlattevő alkalmatlan a szerződés teljesítésére, ha nem rendelkezik az ajánlati felhívás feladásának napjától visszafelé számított 5 évben – a 321/2015. (X.30.) Korm. rendelet 21. § (2a) bekezdés a) pontjára figye… read in fullcollapse
Az alkalmasság minimumkövetelménye(i): M.3.) Ajánlattevő alkalmatlan a szerződés teljesítésére, ha nem rendelkezik az ajánlati felhívás feladásának napjától visszafelé számított 5 évben – a 321/2015. (X.30.) Korm. rendelet 21. § (2a) bekezdés a) pontjára figye… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| TERRA-21. Közmű és Mélyépítő Kft. | 1 | 2026 |
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,344 completed awards — not a statement about this procedure.)
This procedure allows 13 days between publication and deadline — typical in this country is 30 (median of 664 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).