How to bid in this country: portals, deadlines, thresholds →
TOP_PLUS-6.2.1-23-NY1-2025-00005_Design
TOP_PLUSZ-6.2.1-23-NY1-2025-00005_Tervezés — original title
Your path to submission
- Deadline: 10 November at 13:00 — 10 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
PART 1 - Development of Forest Gymnastics Track Permit-level plan delivery with Natura 2000 impact assessment; incorporation of the comments of the design jury and carrying out authorisation procedures; Preparation of the implementation plan and performance of the Designer’s foremanship tasks; technical support for public procurement procedures for related works in relation to a planned investment with the following characteristics. The design area is the Forest Gymnastics Track, which is located in the southern part of the Sóstó Forest, on the northern side of Csaló köz. The area currently has outdoor sports equipment, a playground, a bacon-baking area, and a forest stage. The aim of the development is to create an accessible water block and cover the existing stage. Barrier-free sanitary block - 1 pc The sanitary block must be designed in a way that is accessible to all user groups.…
Show full description
… Mandatory features to be developed: - men's and women's sanitary facilities, - barrier-free sanitary facilities, - cleaning and storage rooms. During the design of the water block, the documentation required for the water law permit must also be prepared. Covering an existing forest stage - 1 - requires the use of landscape-specific structures and materials, - must not disturb the landscape, - must not involve significant terrain or vegetation disturbances, - must be designed in accordance with nature conservation and seasonal restrictions. The design shall ensure: - the orderly drainage and dewatering of rainwater, - the construction of a storage facility suitable for the placement of stage mobiles, - long-term maintenance, operability, - minimizing energy costs. Designer’s foremanship (5 sessions), professional support for the future construction public procurement procedure(s) related to the project, preparation of rehabilitation engineering certification, and the performance of cost expert tasks pursuant to Section 19(4) of Act LXIX of 2023 (Abtv.). The designer is responsible for the soundness of the cost estimates and cost calculations related to the investment (unpriced/priced designer budget) and for the adequacy of the architectural and technical documentation. The designer does not have to be a separate cost expert. PART 2 - Creation of a recreation park Preparation of a construction plan (including the design of a promenade/road); incorporation of the comments of the design jury and carrying out authorisation procedures; the performance of design management tasks; technical support for public procurement procedures for related works in relation to a planned investment with the following characteristics. The design area is located in the northern part of Nyíregyháza, in the northeast corner of the Sóstó Forest. Borders: to the north: Oak Street, east: railway area, west and south: the Sóstó Forest. The northern planning area is divided into two distinct parts: Municipally owned forest area along the railway with a total area of about 9 700 m2. Forest area owned by Nyírség Erdészeti Zrt., through which a 230 m long path and a 113 m long forest strip pass. The aim of the development is to create a rest park in the design area. In the area of the rest park, the following functions and elements must be displayed: - setting up an educational trail, - setting up interactive educational points, - setting up bat houses and birdhouses, - setting up a bacon baking place, - setting up tables, benches, sunbathing areas, - setting up bicycle supports, - setting up a billet garden to show natural decay processes. Act XXVI of 1998 on the Rights of Persons with Disabilities and Ensuring Their Equal Opportunities, Act 280/2024 on the Statutes of Urban Planning and Construction Requirements, and Act XXVI of 1998 on the Rights of Persons with Disabilities and Ensuring Their Equal Opportunities. (IX. 30.) on the basis of the provisions of Act C of 2023 on Hungarian Architecture. Designer’s foremanship during construction (5 times between the date of the successful completion of the technical handover and acceptance procedure of the works under the construction contract concluded on the basis of the public procurement procedure for the selection of the contractor),
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (7 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to FŐMTERV Mérnöki Tervező Zrt.n = 7
- 4% of this buyer's awards went to companies that had already won here before (72 awards since 2018, spread over 15 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 72 awards since 2018
- The median procedure drew 4 bids (63 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 63
- 11% of awards went to companies from abroad (72 awards with a known winner country). Sector average: 6%.n = 72
- Across 59 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (43 of 59), References: services (41 of 59), Technical staff for execution (34 of 59), Technical staff for quality control (18 of 59).n = 59
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.
What you must prove — eligibility criteria
A 321/2015. (X. 30.) Korm. rendelet 1. § (1) bekezdése alapján ajánlattevőnek az ajánlatban a Kbt. Második Része szerint megindított jelen közbeszerzési eljárásban ajánlatának benyújtásakor az egységes európai közbeszerzési dokumentum kitöltésével kell előzete… read in fullcollapse
A 321/2015. (X. 30.) Korm. rendelet 1. § (1) bekezdése alapján ajánlattevőnek az ajánlatban a Kbt. Második Része szerint megindított jelen közbeszerzési eljárásban ajánlatának benyújtásakor az egységes európai közbeszerzési dokumentum kitöltésével kell előzete… read in fullcollapse
Ajánlatkérő a Kbt. 65. § (1) bekezdés c) pont alapján és az építési beruházások, valamint az építési beruházásokhoz kapcsolódó tervezői és mérnöki szolgáltatások közbeszerzésének részletes szabályairól szóló 322/2015. (X.30.) Korm. rendelet (továbbiakban: 322/… read in fullcollapse
A 321/2015. (X. 30.) Korm. rendelet 1. § (1) bekezdése alapján ajánlattevőnek az ajánlatban a Kbt. Második Része szerint megindított jelen közbeszerzési eljárásban ajánlatának benyújtásakor az egységes európai közbeszerzési dokumentum kitöltésével kell előzete… read in fullcollapse
A 321/2015. (X. 30.) Korm. rendelet 1. § (1) bekezdése alapján ajánlattevőnek az ajánlatban a Kbt. Második Része szerint megindított jelen közbeszerzési eljárásban ajánlatának benyújtásakor az egységes európai közbeszerzési dokumentum kitöltésével kell előzete… read in fullcollapse
Ajánlatkérő a Kbt. 65. § (1) bekezdés c) pont alapján és az építési beruházások, valamint az építési beruházásokhoz kapcsolódó tervezői és mérnöki szolgáltatások közbeszerzésének részletes szabályairól szóló 322/2015. (X.30.) Korm. rendelet (továbbiakban: 322/… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| KE-VÍZ 21 Építőipari zártkörűen működő Részvénytársaság | 3 | 2024–2026 |
| Mészáros és Mészáros Ipari, Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság | 2 | 2024–2025 |
| MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság | 1 | 2025 |
| ZEMPLÉNKŐ Kelet-magyarországi Építőipari Fővállalkozó és Bányászati Korlátolt Felelősségű Társaság | 1 | 2025 |
| OPUS TITÁSZ Áramhálózati Zártkörűen Működő Részvénytársaság | 1 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 12 or more bids came in. Many compete here — price and references decide. (Based on 7 completed awards — not a statement about this procedure.)
This procedure allows 23 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,146 recorded awards) — mostly from Germany, United Kingdom, Netherlands.
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now