How to bid in this country: portals, deadlines, thresholds →
Development of the András Jósa Museum
Jósa András Múzeum fejlesztése — original title
Your path to submission
- Deadline: 6 November at 12:00 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The aim of the investment is the full-scale development of the Jósa András Museum for tourism purposes. The construction includes the structural reinforcement of the building (priming, slabs, roof structure), the design of protection against soil moisture, the renovation of facades according to the original use of materials and colors of the historic building, the creation of exhibition spaces with modern thermal, air-conditioning and lighting systems, full compliance with museum and artwork protection regulations, interior design works (coverings, paintings, built-in and mobile furniture), full-scale building engineering and electrical upgrades, accessibility according to OTÉK and the “Complex Accessibility” guide, the review and, if necessary, the replacement of the rainwater drainage system, the organization of the external environment and the creation of green surfaces. · Development…
Show full description
… of the Jósa András Museum as detailed below: Complex development of buildings A and B of the existing museum building, demolition of buildings C and D. Buildings A and B are two parts of a building, but they were actually part of a building built together with the same technology at the time of the original construction, the different name being given to the grouping of different functions (offices and apartments). Usable floor area of the building under local protection affected by the renovation: 4043 m2 - Land area: 4695 m2 - Built-in floor space: 2560.48 m2 - Green cover: 527.23 m2 - demolition of building D: 910,16 m2 - demolition of building C: 759,54 m2 - Subsequent injection wall insulation work 296 kerm.m2 - High-pressure injection with soil hardening 1089 m - Relevant branches: architecture, support structure, mechanical engineering, electricity, fire protection, accessibility, environmental planning Compliance with the conditions of technical implementation based on the building information model (BIM) must be applied during the preparation of the implementation plans. Detailed and itemised quantities and detailed technical parameters, as well as the details and characteristics of the task to be performed by the successful tenderer and the detailed technical requirements are set out in the procurement document. The contracting authority draws the attention of T. Tenderers to the fact that if the invitation or the documentation provided contains a reference to a specific make, origin, type of thing, procedure, activity, patent or trademark, the designation was made only in order to unambiguously determine the nature of the object, and whether or not it is listed next to the designation, the contracting authority – the Public Procurement Act. 321/2015 referred to in Section 58(4). (X.30.) on the basis of Section 46(3) of the Government Decree, accepts –equivalent offers. As regards the attestation of equivalence, Decree 321/2015. Section 46(4)-(6) of the Government Decree shall apply.
Contract
Type of service
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (72 awards since 2018, spread over 15 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 72 awards since 2018
- In this sector the buyer awards roughly every 5 months (9 awards, most recently August 2026) — the next award is due around February 2027 by that rhythm. The last award went to TÖMB 2002 Szolgáltató Korlátolt Felelősségű Társaság.n = 9
- The median procedure drew 4 bids (63 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 63
- 11% of awards went to companies from abroad (72 awards with a known winner country). Sector average: 4%.n = 72
- 82% of the bids received came from small and medium-sized enterprises (18 procedures with a bid mix). Sector: 68%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/10/2026.
What you must prove — eligibility criteria
A kiválasztási szempontok felsorolása és rövid ismertetése (irányadó az M.2. alkalmassági minimumkövetelménynél is): A 321/2015. (X. 30.) Korm. rendelet 1.§ (1) bekezdése alapján az ajánlattevőnek az ajánlatának benyújtásakor az egységes európai közbeszerzési … read in fullcollapse
M.2. Az alkalmassági minimumkövetelményt ajánlattevő a Kbt. 65. § (1) bekezdés b) pontja és a Kr. 21. § (2)bekezdés b) pontja szerint köteles igazolni, azoknak a szakembernek - különösen a minőség ellenőrzésért felelőseknek - a megnevezése és M2. szerinti pozí… read in fullcollapse
A kiválasztási szempontok felsorolása és rövid ismertetése: P.1. A 321/2015. (X.30.) Korm. rendelet 19.§ (1) bekezdés c) pontja alapján az Ajánlattevőnek csatolnia kell a cégszerűen (a képviseletre jogosult személy által) aláírt nyilatkozatot a felhívás feladá… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| KE-VÍZ 21 Építőipari zártkörűen működő Részvénytársaság | 3 | 2024–2026 |
| Mészáros és Mészáros Ipari, Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság | 2 | 2024–2025 |
| MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság | 1 | 2025 |
| ZEMPLÉNKŐ Kelet-magyarországi Építőipari Fővállalkozó és Bányászati Korlátolt Felelősségű Társaság | 1 | 2025 |
| OPUS TITÁSZ Áramhálózati Zártkörűen Működő Részvénytársaság | 1 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 9 completed awards — not a statement about this procedure.)
This procedure allows 19 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,338 recorded awards).
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now