How to bid in this country: portals, deadlines, thresholds →
Csapókerti Ált. School renovation planning
Csapókerti Ált. Iskola felújításának tervezése — original title
Your path to submission
- Deadline: 5 November at 11:00 — 4 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Preparation of the approval and construction design documentation required for the implementation of the complex renovation of the Csapókert Primary School · The subject of this procurement is the preparation of the design documentation required for the implementation of the complex renovation of the Csapókert Primary School, as follows: - Preparation of photo documentation before the renovation of the building, which is part of the approval plan. - Type of design documentation to be delivered: - Approval plan documentation with cost estimation and renovation schedule; - Construction plan documentation, with a priced and unpriced budget according to the needs related to the renovation. Type of establishment: Primary school Land area: 7568.95 m2 Current installation: 38.38% Gross floor area built-in: 2904,95 m2 Net floor area: 2977.96 m2 (total area affected by renovation) freestanding…
Show full description
… installation Number of floors: basement+ground floor+floor Max. built-in: 40% Max. building height: Min.green surface:40% Minimum green surface: 40% Level Area Indicator: 1,25 m2/m2 Zone classification: Vi-Sz/6 The building of the General Assembly of the Municipality of Debrecen 19/2023. (VI.22.) under local protection. The planned renovation includes the following: 1. Renovation of roof structures, performing restoration work after wetting (heat and waterproofing) 2. Energy and interior upgrades, which include the refurbishment of the power grid and the related fittings and cabinets 3. Modernisation of the heating system 4. Creation of a community space, renovation and construction of water blocks 5. Complete renovation of the gym 6. Courtyard development 7. Renovation of the two dining rooms 8. Design of an outdoor “classroom” in the front garden 9. Fence, renovation of gates, replacement if necessary 10. Review of fire protection systems according to the function of the building, and it is necessary to examine its feasibility according to the legal obligation. 11. Considering the legal requirements, it is necessary to make the building accessible from the point of view of usability, which is already partly available, such as an accessible entrance. There is no barrier-free toilet in the building. Required professional parts: • architecture • support structure • timber protection • building engineering • building electricity • garden construction • utility • fire protection • barrier-free design chapter Preparation of approval design documentation, - It must include, as a minimum, an assessment of the current state (in terms of architect, mechanic, electrical, support structure and all branches to be involved), a planned site plan, floor plan variations (in variations where possible), changed facades, a short technical description with the presentation of the planned construction materials. - professional technical specifications (mechanical engineer, electrician, weak current, etc.) with the related planned solutions (in variations where possible), with special regard to the eligible activities included in the call for proposals and the budget for implementation - Where this is possible without interfering with the operation of the institution, the detection of hidden structures should also be carried out with temporary restoration. - Making an energy calculation of the existing and planned state. Creating a certified energy performance certificate for the existing state - Photo documentation - The design documentation must include a cost estimate by which the Designer certifies the cost of each planned solution, if it is implemented, it can be implemented within the budget, and it can be eligible on the basis of the call for proposals. - The Property Manager (Debrecen Education District Center, 4026 Debrecen, Kálvin tér 11.) gives an opinion, and the Preparatory Builder (Debrecen Municipality, 4024 Debrecen, Piac utca 20.) approves the design documentation and the corresponding cost estimate. Further planning can only be continued after that. Preparation of construction design documentation, - The current 19
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (17 awards, most recently November 2025) — by that rhythm the next award was due around February 2026. The last award went to MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság.n = 17
- 3% of this buyer's awards went to companies that had already won here before (276 awards since 2017, spread over 44 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 276 awards since 2017
- The median procedure drew 4 bids (234 procedures with a bid count); 12% ended with a single bidder. Sector: median 5 bids.n = 234
- 16% of awards went to companies from abroad (276 awards with a known winner country). Sector average: 6%.n = 276
- Across 16 procedures with structured selection criteria, this buyer most often required: References: services (10 of 16), Minimum turnover in the contract field (10 of 16), Professional register enrolment (10 of 16), References: works (5 of 16).n = 16
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
A Kbt. 65. § (1) bekezdés c) pontja és az építési beruházások, valamint az építési beruházásokhoz kapcsolódó tervezői és mérnöki szolgáltatások közbeszerzésének részletes szabályairól szóló 322/2015. (X. 30.) Kormányrendelet (a továbbiakban: 322/2015. (X. 30.)… read in fullcollapse
Alkalmassági minimumkövetelmény(ek) meghatározása: P.1.) Alkalmatlan az ajánlattevő, ha az ajánlattevőnek a közbeszerzés tárgyából (építészeti tervezés) származó nettó árbevétele nem éri el az utolsó három mérlegfordulónappal lezárt üzleti évben összesen a 40.… read in fullcollapse
A kiválasztási szempontok felsorolása és rövid ismertetése: (M1) A 321/2015. (X. 30.) Korm. rendelet (a továbbiakban VHR321) 1. § (1) bekezdése alapján az ajánlattevőnek és a kapacitást nyújtó szervezetnek az ajánlatában az egységes európai közbeszerzési dokum… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ETIAM Korlátolt Felelősségű Társaság | 2 | 2024–2025 |
| "HOR" Kereskedelmi és Szolgáltató Zártkörű Részvénytársaság | 2 | 2023–2024 |
| INFODIGIT Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 2 | 2025–2026 |
| OPUS TITÁSZ Áramhálózati Zártkörűen Működő Részvénytársaság | 2 | 2024–2025 |
| ARCHI-BAR Építész Stúdió Korlátolt Felelősségű Társaság | 2 | 2024 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 17 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,146 recorded awards) — mostly from Germany, United Kingdom, Netherlands.
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now