Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Support maintenance and breakdown service with deployment of manned equipment, suction trucks and street makers work

Ondersteuning onderhoud en storingsdienst met inzet bemand materieel, zuigwagens en stratenmakers werkzaamheden — original title

NLNetherlands · Zoetermeer

Your path to submission

  1. Deadline: 7 December at 12:00 — 36 days left.
  2. You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
  3. Offer and evidence in: Dutch.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

De opdracht omvat het beschikbaar stellen van vakbekwaam personeel, bemand materieel en uitvoerende werkzaamheden ter ondersteuning van gepland onderhoud, storingen en calamiteiten aan transport-, distributie- en aansluitleidingen. Met deze aanbesteding beoogt Dunea raamovereenkomsten af te sluiten met deskundige en direct inzetbare opdrachtnemers. · Perceel 1 omvat de levering en inzet van een zelfrijdende zuigwagen inclusief ervaren machinist ten behoeve van werkzaamheden aan de drinkwaterinfrastructuur van Dunea. De werkzaamheden vinden plaats binnen het gehele verzorgingsgebied van Dunea, waaronder openbare ruimte, stedelijk gebied, natuurgebieden, duingebieden en waterwingebieden. De zuigwagen wordt ingezet voor het veilig en efficiënt vrijmaken van ondergrondse leidingen, appendages en overige infrastructuur door het wegzuigen van grond, zand, puin en andere vrijkomende materialen.…

Show full description

… Daarnaast maakt een 24/7 beschikbaarheidsdienst onderdeel uit van de opdracht ten behoeve van storingen en calamiteiten. · Perceel 2 omvat de levering en inzet van twee trekker-/aanhangerzuigwagens inclusief ervaren machinisten ten behoeve van werkzaamheden aan de drinkwaterinfrastructuur van Dunea. Zuigwagen 2a wordt structureel vijf werkdagen per week ingezet en maakt onderdeel uit van de storingsdienst buiten kantoortijden. Zuigwagen 2b wordt naar verwachting gemiddeld circa 18 uur per week ingezet en kan aanvullend buiten kantoortijden worden ingezet. De trekker-/aanhangerzuigwagens worden ingezet voor het vrijmaken van ondergrondse leidingen, appendages, afsluiters en overige infrastructuur door het wegzuigen van grond, zand, puin en andere vrijkomende materialen. De werkzaamheden vinden plaats binnen het gehele verzorgingsgebied van Dunea, waaronder stedelijk gebied, natuurgebieden, duingebieden en waterwingebieden. · Perceel 3 omvat de levering en inzet van grondverzetmaterieel inclusief gekwalificeerde machinisten ten behoeve van werkzaamheden aan de drinkwaterinfrastructuur van Dunea. Onderdeel van de opdracht is het ontgraven, aanvullen en verplaatsen van grond en overige materialen die vrijkomen bij werkzaamheden aan het drinkwaternet. De werkzaamheden vinden plaats binnen het gehele verzorgingsgebied van Dunea, waaronder stedelijk gebied, natuurgebieden, duingebieden en waterwingebieden. · Perceel 4 omvat het beschikbaar stellen van vakbekwame stratenmakers voor het herstellen en aanbrengen van verhardingen die voortvloeien uit werkzaamheden aan de drinkwaterinfrastructuur van Dunea. De werkzaamheden worden uitgevoerd binnen het verzorgingsgebied van Dunea.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated value€20,500,000
Published16 Oct 2026
ProcedureOpen procedure
Contract period1 Jul 2027 → 1 Jul 2031
Framework agreement4 lotsReserved for SMEs

Type of service

65 · Public utilities45 · Construction work71 · Architecture & engineering43 · Mining & construction machinery
CPV 65111000 · 45000000 · 71000000 · 71330000 · 71500000 · 45112400 · 45232150 · 45112000

Clement What the numbers say about this buyer

  • 0% of this buyer's awards went to companies that had already won here before (15 awards since 2018, spread over 5 companies). 100% went to new names.n = 15 awards since 2018
  • The median procedure drew 3 bids (13 procedures with a bid count); 23% ended with a single bidder.n = 13
  • 13% of awards went to companies from abroad (15 awards with a known winner country).n = 15

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Youforce B.V.12025
Electrotechnisch-Installatiebureau van Ginderen B.V.12025
IJK B.V.12025
GMB Services B.V.12024
G. van der Ven BV Aannemingsbedrijf12024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Monday 7 December at 12:00

Tactics

This procedure allows 53 days between publication and deadline — typical in this country is 48 (median of 2,911 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In the Netherlands, 2,082 contracts went to foreign companies over the last 3 years (of 35,768 recorded awards) — mostly from Germany, France, Belgium.

Submission language: Dutch.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
Bids are submitted on TenderNed — TED carries the same notice, usually with the more detailed specification. Read both.
TEDNoticeTenderNedSubmission portal
Put together the evidence — in Dutch
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now