How to bid in this country: portals, deadlines, thresholds →
Extension of the Langenzenn Primary School - Technical Planning Technical Equipment and Project Planning Engineering Structures
Erweiterung Grundschule Langenzenn – Fachplanung Technische Ausrüstung und Objektplanung Ingenieurbauwerke — original title
Your path to submission
- Deadline for requests to participate: 13 November at 10:00 — 12 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: German.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The city of Langenzenn plans to expand and renovate its primary school to a small extent. With this measure, the teaching area can be restructured and extended for the full-day area (BRI approx. 1,900 m3, GFA approx. 690 m2). The primary school consists of the 4 components A/B/C-South/C-North.The planning services are limited to the component C-South. There, a connecting building on the ground floor is to be demolished and rebuilt with an extension over three floors (UG/EG/OG).In the basement, the existing cafeteria and a lounge will be renovated and a canteen kitchen will be created in the annex and the cafeteria will be expanded. On the ground floor and also on the upper floor, a new connecting corridor, a new classroom, a marketplace for open lessons and a cloakroom are to be created. Technical equipment: The services for technical equipment include the supply of heat from the…
Show full description
… existing heating system to the new rooms, the power supply and the construction of a separate subdistribution for the cultivation and the new cafeterias, water supply and sewage disposal for dirty and surface water, telecommunication / information technology systems for classrooms and cafeteria area and the use-specific systems of the cafeteria kitchen. This affects plant groups 1, 2, 4, 5 and 7.Object planning of civil engineering structures: In the area of cultivation there are drainage channels in the open-air systems, which must be retrassed before the start of construction work. This new alignment is restricted by the extension and conversion of the main access staircase system. This new layout is to be developed together with the building and open-air facilities planning already within the service phases 1 and 2, in order to determine influences on the geometry of both the extension and the stair system in advance.The award is based on the services according to HOAI Part 3 Section 3 (Engineering Structures Lph. 1 to 9 with special performance of object monitoring) and Part 4, Section 2 (Technical equipment, Lph. 1 to 9). · The city of Langenzenn plans to expand and renovate its primary school to a small extent. With this measure, the teaching area can be restructured and extended for the full-day area (BRI approx. 1,900 m3, GFA approx. 690 m2). The primary school consists of the 4 components A/B/C-South/C-North.The planning services are limited to the component C-South. There, a connecting building on the ground floor is to be demolished and rebuilt with an extension over three floors (UG/EG/OG).In the basement, the existing cafeteria and a lounge will be renovated and a canteen kitchen will be created in the annex and the cafeteria will be expanded. On the ground floor and also on the upper floor, a new connecting corridor, a new classroom, a marketplace for open lessons and a cloakroom are to be created.Technical equipment:The services for technical equipment include the supply of heat from the existing heating system to the new rooms, the power supply and the construction of a separate subdistribution for the cultivation and the new cafeterias, water supply and sewage disposal for dirty and surface water, telecommunication/information technology systems for classrooms and cafeteria area and the use-specific systems of the cafeteria kitchen. This affects plant groups 1, 2, 4, 5 and 7.Object planning of civil engineering structures: In the area of cultivation there are drainage channels in the open-air systems, which must be retrassed before the start of construction work. This new alignment is restricted by the extension and conversion of the main access staircase system. This new layout is to be developed together with the building and open-air facilities planning already within the service phases 1 and 2, in order to determine influences on the geometry of both the extension and the stair system in advance.The award is based on the services according to HOAI Part 3 Section 3 (Engineering Structures Lph. 1 b
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 5 months (3 awards, most recently June 2019) — by that rhythm the next award was due around November 2019. The last award went to ibz Ingenieurbüro Zeisig GmbH & Co. KG.n = 3
- Across 3 procedures with structured selection criteria, this buyer most often required: References: services (3 of 3), Staff qualifications (3 of 3), Minimum annual headcount (3 of 3), Share of subcontractors (3 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
330312Gefordert werden Nachweise und Angaben u. a. nach VgV und GWB,insbesondere nach § 45 VgV. Details sind dem Bewerbungsbogen unter Ziffer 7) zu entnehmen. Eigenerklärung über den Gesamtumsatz des Unternehmens der letzten 3 Geschäftsjahre und für entspreche… read in fullcollapse
Berufshaftpflichtversicherung des Auftragnehmers/der ARGE über 3 000 000,00 EUR für Personenschäden und 3 000 000,00 EUR für sonstige Schäden bei einem, in einem Mitgliedsstaat der EU oder eines Vertragsstaates des Abkommens über den Europäischen Wirtschaftsra… read in fullcollapse
Details sind dem Bewerbungsbogen unter Ziffer 8.3 und ff. zu entnehmen. Hier exemplarisch für Teil I des Bewerberbogens (8.3.1): Referenzen gemäß Referenzformblatt (dabei ist das vom Auslober zur Verfügung gestellte Referenzformblatt zwingend zu verwenden). Es… read in fullcollapse
Gefordert werden Nachweise und Angaben u. a. nach VgV und GWB,insbesondere nach §44 VgV. Details sind dem Bewerbungsbogen unter Ziffer 6) zu entnehmen. Der Nachweis der erlaubten Berufszulassung des Inhabers/der Inhaberin oder der Führungskräfte des Unternehme… read in fullcollapse
Das jährliche Mittel der in den letzten 3 abgeschlossenen GeschäftsjahrenBeschäftigten getrennt nach sonstigen Beschäftigten und Ingenieuren, Architekten, ohneFührungskräfte. Details sind dem Bewerbungsbogen unter Ziffer 8) des jeweiligen Fachbereiches (Teil I… read in fullcollapse
Gefordert werden Nachweise und Angaben u. a. nach VgV und GWB,insbesondere nach § 45 VgV. Details sind dem Bewerbungsbogen unter Ziffer 7) zuentnehmen. Eigenerklärung über den Gesamtumsatz des Unternehmens der letzten 3Geschäftsjahre. Die Höhe des Umsatzes wir… read in fullcollapse
Gefordert werden Nachweise und Angaben u. a. nach VgV und GWB,insbesondere nach § 45 VgV. Details sind dem Bewerbungsbogen unter Ziffer 7) des jeweiligen Fachbereiches (Teil I bis V) zu entnehmen. Eigenerklärung über den Umsatz des Unternehmens bezogen auf das… read in fullcollapse
Gefordert werden Nachweise und Angaben u. a. nach VgV und GWB,insbesondere nach §44 VgV. Details sind dem Bewerbungsbogen unter Ziffer 6) des jeweiligen Fachbereiches (Teil I bis V) zu entnehmen. Der Nachweis der erlaubten Berufszulassung des Inhabers/der Inha… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Keim Archiktekten · Fürth | 2 | 2018 |
| Ziegler · Giengen | 2 | 2010 |
| MAN · Langenhagen | 1 | 2014 |
| Fa. Kolb GmbH & CO.KG · Augsburg | 1 | 2016 |
| Franz Nüsing GmbH & Co. KG · Münster | 1 | 2015 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 6 completed awards — not a statement about this procedure.)
This procedure allows 29 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.
Foreign bidders
In Germany · Architecture & engineering, 404 contracts went to foreign companies over the last 3 years (of 111,169 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: German.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now