Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Rural - Modular and Circular Railbound Buildings

Landelijk - Modulaire en Circulair Railgebonden Gebouwen — original title

NLNetherlands · Utrecht

Your path to submission

  1. Deadline: 12 November at 12:00 — 11 days left.
  2. You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
  3. Offer and evidence in: Dutch.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

ProRail needs ​ supply of modular and circular rail-related buildings (RGGs), consisting of standardised modules that are used to house rail-related technical installations (including energy supply, train security and telecom/ICT) within ProRail’s assets. These modules should contribute to a future-proof and sustainable rail design, with standardisation, circularity and flexibility at its core. The aim of this call for tenders is to conclude a framework agreement with one party on the supply, filling with technical systems, storage, overhaul and dismantling of modular rail-related buildings to meet this need. The maximum number of systems (modules) to be procured is 270 pieces.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeSupplies
Estimated valuevalue not published
Published14 Oct 2026
ProcedureOpen procedure
Framework agreement

Type of service

44 · Construction materials
CPV 44211100

Clement What the numbers say about this buyer

  • 19% of this buyer's awards went to companies that had already won here before (696 awards since 2015, spread over 166 companies). That is well above the sector norm (4%) — newcomers have a harder time here than elsewhere.n = 696 awards since 2015
  • The median procedure drew 3 bids (629 procedures with a bid count); 27% ended with a single bidder. Sector: median 3 bids.n = 629
  • The award came in at a median 86% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 8
  • 12% of awards went to companies from abroad (696 awards with a known winner country). Sector average: 9%.n = 696
  • 27% of the bids received came from small and medium-sized enterprises (291 procedures with a bid mix). Sector: 27%.n = 291

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — via the ESPD

The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
VolkerRail Nederland B.V.202024–2026
Dura Vermeer Railinfra B.V.142024–2026
SWIETELSKY RAIL BENELUX B.V.132024–2026
Arcadis Nederland B.V.122023–2026
Movares Nederland B.V.122024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2024
4
2025
3
2026
9 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 12 November at 12:00

Tactics

When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 343 completed awards — not a statement about this procedure.)

This procedure allows 30 days between publication and deadline — typical in this country is 48 (median of 2,911 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In the Netherlands · Construction materials, 33 contracts went to foreign companies over the last 3 years (of 410 recorded awards) — mostly from Germany, Belgium, Denmark.

Submission language: Dutch.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
Bids are submitted on TenderNed — TED carries the same notice, usually with the more detailed specification. Read both.
TEDNoticeTenderNedSubmission portal
Put together the evidence — in Dutch
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now