How to bid in this country: portals, deadlines, thresholds →
Kløvermarken, New facilities for changing rooms and AK Thor
Kløvermarken, Nye faciliteter til omklædning og AK Thor — original title
Your path to submission
- Deadline for requests to participate: 5 November at 12:00 — 4 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Danish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The assignment includes total consultancy in connection with the modernization of the facilities in Kløvermarken, including new changing facilities for the football clubs and new training and changing facilities for the weightlifter club AK Thor · The assignment includes total consultancy in connection with the modernization of the facilities for the many users in Kløvermarken, including new changing facilities for the football clubs and new training and changing facilities for the weightlifter club AK Thor Part of the existing changing buildings must be demolished. Approximately the same number of m2 of changing rooms must be re-established for football clubs (approximately 760 m2 gross). The new, modern changing rooms are designed to make better use of the facilities, so that more users will be able to access them than is the case today. Likewise, AK Thor will be established on the…
Show full description
… same area as they have today (approx. 305 m2 gross). The new buildings are expected to be adapted to, and to be inspired by, the old red wood-clad barracks in the area. It is immediately expected that they will be built in wood, but with incorporated quality solutions for the many m2 of wet rooms in the buildings. We can work with solutions with prefabricated building modules, which are lowered on prepared foundations. Sustainability must be a priority. The existing facilities must be usable throughout the process, which means that new ones must be built before they can be demolished. The cafe building is in poor condition, but due to lack of authorization for this, the cafe is only supposed to be slightly renovated. An upcoming grant is expected for a new cafe building, which is why a future scenario has already been included in the situation plan, with a field reserved for the location of the upcoming new cafe building. The outdoor areas must be improved and functional and safe outdoor spaces must be created that can be used for living, community and social events. The tendered task includes total consultancy in connection with demolition and new construction. The overall consultancy includes phased design starting with the outline proposal phase and according to the phases indicated in YBL 18. Further details of the services provided by the adviser can be found in the tender documents. Total Advisor is obliged, throughout the process, to coordinate with all relevant stakeholders, including, but not limited to, Byggeri København (ByK), Kultur- og Fritidsforvaltningen (KFF), user representatives from Kløvermarken, Klima-, Miljø- og Teknikforvaltningen (KTF) and other authorities, Hovedstadens Forsyningsselskab (HOFOR) and their possible advisors, so that all relevant stakeholders are consulted and to an agreed extent taken into account in the design and during the execution.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 12 months (7 awards, most recently September 2026) — the next award is due around September 2027 by that rhythm. The last award went to Rønnow Leth & Gori.n = 7
- 4% of awards went to companies from abroad (254 awards with a known winner country). Sector average: 34%.n = 254
- 93% of the bids received came from small and medium-sized enterprises (11 procedures with a bid mix). Sector: 31%.n = 11
- 53% of this buyer's awards went to companies that had already won here before (254 awards since 2017, spread over 57 companies). That is well above the sector norm (27%) — newcomers have a harder time here than elsewhere.n = 254 awards since 2017
- The median procedure drew 2 bids (236 procedures with a bid count); 46% ended with a single bidder. Sector: median 5 bids.n = 236
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
Blandt egnede ansøgere vil ordregiveren vælge dem med mest relevante erfaring med sammenlignelige udførte projekter. Ved ”udførte” forstås projekter, som hvor entreprisen er afleveret iht AB18. Blandt egnede ansøgere vil ordregiver vælge dem, med mest relevant… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| P. KORTEGAARDS PLANTESKOLE A/S | 52 | 2024–2026 |
| Birkholm Planteskole A/S | 33 | 2024–2026 |
| Hennecke stauder | 17 | 2024–2026 |
| FLORUM.DK ApS | 9 | 2024–2026 |
| NATURBYG DK ApS | 5 | 2025–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 7 completed awards — not a statement about this procedure.)
This procedure allows 24 days between publication and deadline — typical in this country is 32 (median of 309 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Denmark · Architecture & engineering, 423 contracts went to foreign companies over the last 3 years (of 1,272 recorded awards) — mostly from Germany, Finland, Bulgaria.
Submission language: Danish.
How to bid