Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Reversal in 2027

Rückung 2027 — original title

DEGermany · Altenberg

Your path to submission

  1. Deadline: 10 November at 08:00 — 9 days left.
  2. You submit on AI Vergabeplattform — not here and not by e-mail. ↗ Free bidder account on the state platform required; electronic submission, usually plain text form. Sort out account and signature first — not on submission day.
  3. Offer and evidence in: German.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Timber recovery in 2027 with forwarder and supply unit in 11 lots (per area) in the Bärenfels Forest District · Regular recovery 328 fm (4th quarter); Requirements: Sanitary wood 200 fm, engine manual refurbishment and recovery 250 fm, fence dismantling/building 200 lfm, road repair 200 lfm; Time wage: Fence repair 20 h, deadwood 20 h. Special features: mean return distance 600-1,000 m, block overlay 10-15 %. · Regular reverse 160 fm (1st quarter); Requirements: Sanitary wood 250 fm, motor manual processing and recovery 400 fm; Time wage: Deadwood 50 h. Special features: mean return distance 600-1,000 m. · Regular return 160 fm (1st quarter); Requirements: Sanitary wood 250 fm, motor manual processing and recovery 400 fm; Time wage: Deadwood 50 h. Special features: mean return distance 600-1,000 m. · Regular return 918 fm (4th quarter); Requirements: Sanitary wood 300 fm, motor manual…

Show full description

… refurbishment and recovery 200 fm, path repair 2,000 lfm; Time wage: Deadwood 40 h. Special features: mostly heavily restricted (55-60%). · Regular reverse 50 fm; Requirements: engine manual refurbishment and recovery 50 fm, fence dismantling/build-up 100 lfm; Time wage: Fence repair 20 h, deadwood 20 h. Special features: mainly heavily restricted (85-90%), high block overlay (55-60%). · Regular reverse 50 fm (3rd quarter); Requirements: Sanitary wood 300 fm, engine manual refurbishment and recovery 200 fm, fence dismantling/building 400 lfm; Time wage: Fence repair 50 h, deadwood 50 h. · Regular recovery 243 fm (4th quarter); Requirements: Sanitary wood 300 fm, engine manual refurbishment and recovery 250 fm, fence dismantling/building 150 lfm, path repair 1,000 lfm; Time wage: Fence repair 24 h, deadwood 40 h. Special features: Location Sonnenbadstraße/Flügelberg, not in one impact, time interruptions possible. · Regular reverse 200 fm (1st quarter, mainly beech); Requirements: Sanitary wood 200 fm, motor manual processing and recovery 100 fm; Time wage: Deadwood 50 h. Special features: Removal of heavy beech trusses with cable tugs; mean return distance less than 300 m.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuevalue not published
Published13 Oct 2026
ProcedureOpen procedure
Contract period4 Jan 2027 → 31 Dec 2027
Place of performanceAltenberg
11 lotsReserved for SMEs

Type of service

77 · Agricultural services
CPV 77210000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (126 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Green-Projects - Steffen Röber.n = 126
  • 71% of this buyer's awards went to companies that had already won here before (126 awards since 2019, spread over 37 companies). That is well above the sector norm (52%) — newcomers have a harder time here than elsewhere.n = 126 awards since 2019
  • The median procedure drew 4 bids (125 procedures with a bid count); 10% ended with a single bidder. Sector: median 6 bids.n = 125
  • 9% of the bids received came from other countries (60 procedures with a bid mix) — all bidders, not just the winners. Sector: 5%.n = 60
  • Not one of the 126 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 126

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Thomas Behrisch Holzeinschlags- und Rückeunternehmen e.K.152020–2026
Forstunternehmen Behrisch GbR · Rabenau122020–2026
Forstbetrieb Rinke92023–2026
Forst- und Gartendienstleistungen Jonas Stielper72025–2026
Lürssen Baumschulen GmbH & Co. KG, Standort Großthiemig · Großthiemig62024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

10
2019
21
2020
25
2021
37
2022
47
2023
111
2024
109
2025
62
2026
422 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Tuesday 10 November at 08:00

Tactics

When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 135 completed awards — not a statement about this procedure.)

This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Germany · Agricultural services, 222 contracts went to foreign companies over the last 3 years (of 12,697 recorded awards) — mostly from Austria, Poland, Netherlands.

Submission language: German.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 3 portals
Bids are submitted on AI Vergabeplattform — TED carries the same notice, usually with the more detailed specification. Read both.
Put together the evidence — in German
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now