Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

‘Conversion of the building into an Alzheimer Centre – PV plant contractor’

„Přestavba objektu na Alzheimercentrum – zhotovitel FVE" — original title

CZCzechia · Praha - Holešovice

Your path to submission

  1. Deadline: 10 November at 09:00 — 9 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: Czech.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is the supply, installation and commissioning of a photovoltaic power plant (hereinafter also referred to as ‘PV power plant’) within the scope of the authorised project for the conversion of the building into a social care facility – Alzheimercentrum, Čeňka Zemana 431, Černčice u Loun. incl. turnkey battery storage, including training of the contracting authority’s responsible staff and related engineering activities. The subject of delivery is the implementation (installation and assembly) and the actual commissioning of the PV plant and accumulation, including related engineering activities to the necessary extent. The subject of the contract is contained in the project documentation, which forms Annex 4 to this Act. The produced PV plants will be used to cover the building's own electricity consumption. Any excess electricity will be stored in batteries.…

Show full description

… The construction of the PV plant will consist of the installation of PV panels on the roofs of the contracting authority's building. PV panels will be installed using a structural system standardized for the roof installation specified in the project documentation. The structures will be laid out and constructed to withstand the weather conditions of the site. Before starting the assembly, the supplier shall prepare a design of the wiring (stringplan) of the offered system in the design program of its manufacturer, document compliance with the manufacturer's rules and submit it to the designer for approval; the layout shall correspond to the layout drawing of the technology. The design is used for confirmation by the manufacturer, for the creation of a physical layout in the monitoring portal and for commissioning. It is not possible to change the layout without the approval of the designer. The subject of the contract will thus include the supply of complete technology, the installation of structures, PV panels and storage for electricity storage. Furthermore, complete necessary wiring and modification of existing switchboards (if necessary) at the connection point. The order also includes the processing of documentation of the actual state. The obligation of the selected supplier as part of the performance of the contract is also related engineering, in particular ensuring the connection of the completed work to the electricity network with the relevant distributor.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerSC - Louny s.r.o.
TypeSupplies
Estimated valueCZK 11,004,475
Published12 Oct 2026
ProcedureOpen procedure
EU-funded

Type of service

09 · Petroleum & fuels31 · Electrical machinery45 · Construction work
CPV 09330000 · 09331000 · 09331200 · 09332000 · 31400000 · 31430000 · 45310000
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
TRANSPARENT atelier s.r.o.12025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Tuesday 10 November at 09:00

Tactics

When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 2,527 completed awards — not a statement about this procedure.)

This procedure allows 29 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Czechia · Petroleum & fuels, 17 contracts went to foreign companies over the last 3 years (of 3,303 recorded awards).

Submission language: Czech.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in Czech
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now