‘Oil controllable choke 400 kV’ - Supply
„Olejová regulovateľná tlmivka 400 kV“ - dodávka — original title
Your path to submission
- Deadline: 23 November at 10:00 — 22 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Offer and evidence in: Slovak.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is the supply and installation of 400 kV of oil controllable chokes, which will be located in the PS SR in the Veľké Kapušany electrical station. 200 MVAr oil choke at Un 420 kV (max. continuous operating voltage 430 kV; hereinafter referred to as the ‘Duty’), including its testing at the manufacturing plant, importing, assembling and testing at the unit, and participation and coordination with the construction contractor in its commissioning. The necessary construction and technological part will be the subject of the separate PNI well in advance of the delivery date and will be procured by the PP procedure in order not to artificially divide the subject of the contract. The estimated delivery time is 5 years from the signature of the delivery contract. More detailed information on the subject of the contract is provided in the Contract, including its…
Show full description
… annexes, which is published at the following address: https://sepsas.eranet.sk/#/tenderPublicDetails/1161 Annexes 2, 3 and 8 to the Agreement will be provided to candidates in accordance with points 29.7 and 29.8 of the Competition Documentation. · The subject of the contract is the delivery and installation of 400 kV oil adjustable chokes, which will be located in the PS SR in the Veľké Kapušany electrical station. 200 MVAr oil choke at Un 420 kV (max. continuous operating voltage 430 kV; hereinafter referred to as the ‘Duty’), including its testing at the manufacturing plant, importing, assembling and testing at the unit, and participation and coordination with the construction contractor in its commissioning. The necessary construction and technological part will be the subject of the separate PNI well in advance of the delivery date and will be procured by the PP procedure in order not to artificially divide the subject of the contract. The estimated delivery time is 5 years from the signature of the delivery contract. Further information on the subject of the contract can be found in the Contract, which is published at the following address: https://sepsas.eranet.sk/#/tenderPublicDetails/1161 Annexes 2, 3 and 8 to the Agreement will be provided to candidates in accordance with points 29.7 and 29.8 of the Competition Documentation.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (8 awards, most recently October 2025) — by that rhythm the next award was due around February 2026. The last award went to Alter Energo, a.s.n = 8
- 20% of this buyer's awards went to companies that had already won here before (70 awards since 2018, spread over 15 companies). That is well below the sector norm (46%) — this buyer switches suppliers more often than others.n = 70 awards since 2018
- 12% of the bids received came from other countries (29 procedures with a bid mix) — all bidders, not just the winners. Sector: 31%.n = 29
- 33% of awards went to companies from abroad (70 awards with a known winner country). Sector average: 47%.n = 70
- The median procedure drew 4 bids (65 procedures with a bid count); 14% ended with a single bidder. Sector: median 3 bids.n = 65
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| VUJE, a.s. | 4 | 2024–2025 |
| LiV ELEKTRA, a.s. | 4 | 2024–2025 |
| Alter Energo, a.s. | 3 | 2024–2025 |
| EGEM, s. r. o. | 3 | 2024–2025 |
| ELCON BRATISLAVA, a.s. | 2 | 2025–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 8 completed awards — not a statement about this procedure.)
This procedure allows 42 days between publication and deadline — typical in this country is 30 (median of 773 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Slovakia · Electrical machinery, 52 contracts went to foreign companies over the last 3 years (of 224 recorded awards) — mostly from Czechia, Germany, Poland.
Submission language: Slovak.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now