How to bid in this country: portals, deadlines, thresholds →
PV plant – Nymburk Ice Stadium and the Elbe Relaxation Centre
FVE – Zimní stadion Nymburk a Relaxační centrum Labe — original title
Your path to submission
- Deadline: 9 November at 10:00 — 8 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of both parts of this public contract is the supply and installation of a photovoltaic power plant (‘PV power plant’), including its connection to the existing electrical installation of buildings, connection to the contracting authority’s distribution system and the provision of service activities, including the guarantee of the supply of spare parts. The subject of both parts of this public contract is the supply of new PV installations (devices). They must be newly acquired or manufactured equipment which has not yet been used for its purpose. A detailed description of the subject of performance is given in relation to the Pool section in the binding template of the contract for work constituting Annex 8 to the tender specifications (‘the Pool contract’) and the Winter Stadium section in the binding template of the contract for work constituting Annex 9 (‘the Winter…
Show full description
… Stadium contract’, the Pool contract and the Winter Stadium contract together (‘the contracts’). · The subject is the delivery and installation of a PV plant for the construction of a swimming pool in the territory of the city of Nymburk (Elbe Relaxation Centre), while a detailed description of the subject of performance of this part is provided in the Pool contract. · The subject is the delivery and installation of a PV plant for the construction of an ice rink in the territory of the city of Nymburk (Winter Stadium Nymburk), while a detailed description of the subject of performance of this part is specified in the contract Winter Stadium.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 16 months (7 awards, most recently June 2026) — the next award is due around October 2027 by that rhythm. The last award went to Planergy s.r.o.n = 7
- 16% of this buyer's awards went to companies that had already won here before (33 awards since 2015, spread over 18 companies). That is well below the sector norm (49%) — this buyer switches suppliers more often than others.n = 33 awards since 2015
- 100% of the bids received came from small and medium-sized enterprises (11 procedures with a bid mix). Sector: 32%.n = 11
- The median procedure drew 4 bids (26 procedures with a bid count); 15% ended with a single bidder. Sector: median 3 bids.n = 26
- The award came in at a median 65% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 74%.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| K-net Technical International Group, s.r.o. | 4 | 2024 |
| Powertica Energie a.s. | 2 | 2024 |
| Pražská plynárenská, a.s. | 2 | 2024 |
| MATEX HK s.r.o. | 1 | 2015 |
| OK GARDEN s.r.o. | 1 | 2015 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually 13 or more bids came in. Many compete here — price and references decide. (Based on 6 completed awards — not a statement about this procedure.)
This procedure allows 32 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Czechia · Petroleum & fuels, 17 contracts went to foreign companies over the last 3 years (of 3,303 recorded awards).
Submission language: Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now