How to bid in this country: portals, deadlines, thresholds →
Sports hall Šternberk
Sportovní hala Šternberk — original title
Your path to submission
- Deadline: 13 November at 10:00 — 12 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the public contract is the complex design and implementation of the new building of the Šternberk Sports Hall using the Design & Build method. The performance will include, in particular, the processing of the subsequent stages of the project documentation, the performance of the necessary surveys and the subsequent implementation of the construction of the sports hall, including the athletic tunnel, the associated outdoor areas, transport and technical infrastructure, technological and sports equipment and other related works and supplies necessary for the proper completion and use of the construction.
Contract
Type of service
Clement What the numbers say about this buyer
- 10% of this buyer's awards went to companies that had already won here before (22 awards since 2015, spread over 10 companies). That is well below the sector norm (75%) — this buyer switches suppliers more often than others.n = 22 awards since 2015
- The median procedure drew 2 bids (15 procedures with a bid count); 40% ended with a single bidder. Sector: median 5 bids.n = 15
- The award came in at a median 53% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 5
- 9% of awards went to companies from abroad (22 awards with a known winner country). Sector average: 7%.n = 22
- 0% of the bids received came from other countries (6 procedures with a bid mix) — all bidders, not just the winners. Sector: 0%.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Pražská plynárenská, a.s. | 2 | 2025 |
| EUROPROLAND s.r.o. | 2 | 2022–2026 |
| RIGHT POWER, a.s., organizační složka | 1 | 2022 |
| MISERICORDIA - Šternberk s.r.o. | 1 | 2024 |
| MAVA spol. s r.o. | 1 | 2024 |
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 15,064 completed awards — not a statement about this procedure.)
This procedure allows 36 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Czechia · Construction work, 143 contracts went to foreign companies over the last 3 years (of 16,823 recorded awards) — mostly from Germany, Poland, France.
Submission language: Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now