Planning Module 1 LPH 2-4 network engineering measures FW-Netz Dessau in Dessau-Roßlau
Planung Modul 1 LPH 2-4 netztechnische Maßnahmen FW-Netz Dessau in Dessau-Roßlau — original title
Your path to submission
- Deadline: 6 November at 08:00 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: German.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Fernwärmeversorgungs- GmbH (FWV), a subsidiary of DVV-Stadtwerke Dessau, plans to further develop the existing district heating network technically, economically and energetically. The aim of the planning is to create a robust technical basis for the subsequent implementation of measures to: - expansion and compaction of the district heating network, - hydraulic optimization, - temperature reduction, - reduction of network losses, - improvement of return temperatures, - increase of energy efficiency, - decentralization of uneconomical network areas, - digitization of home connection stations, - improvement of operational management, - integration of intelligent measurement, control and regulation technology. The engineering services (LPH 2 with option LPH 3 and option LPH 4) contain the following packages of measures: - Package of measures 1 - Grid expansion and grid compaction - Package…
Show full description
… of measures 2 - Line optimisation, temperature reduction and decentralisation - Package of measures 3 - Intelligent home connection stations The order is assigned in stages. Stage 1: Performance phase 2 - Pre-planning stage 2: Performance phase 3 - Design planning stage 3: Service phase 4 - Approval planning The contract is initially awarded only for stage 1 - service phase 2 (preliminary planning), for all three packages of measures. Stage 2 - Performance phase 3 (design planning) of the packages of measures is an option. Stage 3 - Performance phase 4 (permit planning) is an option. · Planning services for Module 1 LPH 2-4 network engineering measures FW-Netz Dessau : - Package of measures 1 - Grid expansion and grid compaction The subject is the investigation and planning of the expansion and compaction of the district heating network in the urban-north area. The starting point is the assumption of about 440 additional house connections. The actual number and scope of expansion must be checked as part of the preliminary and design planning. LPH 2: Particular attention should be paid to: - investigation of suitable path variants, - technical variant evaluation, - hydraulic preliminary design, - determination of essential network parameters, - investigation of integration into the existing network, - identification of significant crossing areas, - examination of technical feasibility, - examination of temporal feasibility, - excessive cost evaluation, - cost estimation, - recommendation of a preferred variant as a decision template for the WG to determine the scope to be further planned. LPH 3: After decision by AG for a certain possibly reduced scope, the following must be processed in particular: - determination of the preferred solution, - detailed hydraulic calculation, - dimensioning of the lines, - planning of the house connections, - pipe statics, - compensation planning, - route planning, - interface planning, - cost calculation, - deadline evaluation, - verification of the actually required expansion scope. LPH 4: The technical approval and approval documents required for the planned measures must be provided. - Package of measures 2 - Line optimisation, temperature reduction and decentralisation The aim is the technical and economic optimisation of the existing district heating network. The focus is on: - temperature reduction, - hydraulic optimization, - nominal width optimization, - reduction of network losses, - identification of hydraulic weak points, - decentralization of uneconomic areas, - optimization of the network structure. LPH 2: In particular: - development or testing of a digital network model, - adoption of existing data, - model validation, - dynamic thermal network simulation, - investigation of relevant load cases, - investigation of temperature reduction, - consideration of additional connections from package 1, - investigation of the effects of package 3, - poor point analysis, - proof of security of supply, - development of network variants, - investigation of decentralization options, - technical and economic
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 9 months (8 awards, most recently April 2026) — the next award is due around January 2027 by that rhythm. The last award went to Dr. Born - Dr. Ermel GmbH - Ingenieure -.n = 8
- 51% of this buyer's awards went to companies that had already won here before (38 awards since 2021, spread over 19 companies). 49% went to new names.n = 38 awards since 2021
- The median procedure drew 2 bids (37 procedures with a bid count); 38% ended with a single bidder. Sector: median 3 bids.n = 37
- From notice to award takes a median 60 days here (9 procedures). Sector: 123 days.n = 9
- Not one of the 38 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 38
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
Eigenerklärung zur Eignung gemäß Formblatt VHB 124 LD Teil 1 - Der Nachweis der Eignung hinsichtlich Formblatt VHB 124_LD "Eigenerklärung zur Eignung" durch die im Formblatt VVB 124 LD geforderten folgenden Einzelnachweise: - Angaben zu Arbeitskräften gemäß Fo… read in fullcollapse
Eigenerklärung zur Eignung gemäß Formblatt VHB 124 LD Teil 3 - Der Nachweis der Eignung hinsichtlich Formblatt VHB 124_LD "Eigenerklärung zur Eignung" durch die im Formblatt VVB 124 LD geforderten folgenden Einzelnachweise: - Eigenerklärung im Formblatt VHB 12… read in fullcollapse
Eigenerklärung zur Eignung gemäß Formblatt VHB 124 LD Teil 4 - Der Nachweis der Eignung hinsichtlich Formblatt VHB 124_LD "Eigenerklärung zur Eignung" durch die im Formblatt VVB 124 LD geforderten folgenden Einzelnachweise: - Erklärung über den spezifischen Um… read in fullcollapse
Eigenerklärung zur Eignung gemäß Formblatt VHB 124 LD Teil 6 - Der Nachweis der Eignung hinsichtlich Formblatt VHB 124_LD "Eigenerklärung zur Eignung" durch die im Formblatt VVB 124 LD geforderten folgenden Einzelnachweise: - Angaben zu Insolvenzverfahren und … read in fullcollapse
Eigenerklärung zur Eignung gemäß Formblatt VHB 124 LD Teil 5 - Der Nachweis der Eignung hinsichtlich Formblatt VHB 124_LD "Eigenerklärung zur Eignung" durch die im Formblatt VVB 124 LD geforderten folgenden Einzelnachweise: Der Bieter hat in den letzten abgesc… read in fullcollapse
Nachweise bei Bewerbung als Bietergemeinschaft und/oder Nachunternehmereinsatz (falls zutreffend) - Der Nachweis mittels Formblatt VHB 234 ist nur bei Bewerbung als Bietergemeinschaft einzureichen - Beabsichtigt der Bewerber, sich bei der Erfüllung des Auftrag… read in fullcollapse
Eigenerklärung zur Eignung gemäß Formblatt VHB 124 LD Teil 2 - Der Nachweis der Eignung hinsichtlich Formblatt VHB 124_LD "Eigenerklärung zur Eignung" durch die im Formblatt VVB 124 LD geforderten folgenden Einzelnachweise: - Bescheinigung Eintragung in das Be… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| GISA GmbH · Halle (Saale) | 6 | 2025 |
| SPIE Building Technology Automation & Traffic GmbH · Georgsmarienhütte | 3 | 2025 |
| Hiller GmbH · Stuttgart | 3 | 2025 |
| Consel Group AG · Fahrweid | 3 | 2025 |
| Ebcont operations GmbH · Neulengbach | 3 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 10 completed awards — not a statement about this procedure.)
This procedure allows 30 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.
Foreign bidders
In Germany · Architecture & engineering, 404 contracts went to foreign companies over the last 3 years (of 111,169 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: German.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now