How to bid in this country: portals, deadlines, thresholds →
PRODUCTS: Lot I Wheeled backhoe loader with accessories and Lot II Mini crawler excavator.
PRODUSE: Lot I Buldoexcavator pe pneuri cu accesorii și Lot II Miniexcavator pe șenile. — original title
Your path to submission
- Deadline: 9 November at 15:00 — 8 days left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Offer and evidence in: Romanian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The purchase of machinery is necessary for: - carrying out activities regarding the maintenance and management of barracks that U.M. 02444 Sibiu has under its administration; - providing the necessary technical support for maintenance, fitting-out/refurbishment activities involving excavation, excavation, demolition, drilling, frequently carried out in narrow or restricted spaces such as inner courtyards, alleys, sidewalks or technical enclosures in the barracks in the administration of U.M. 02444 Sibiu. The purchase will end with the conclusion of the product contracts. The model contract is attached to the tender documentation. The purchase of the products will be carried out in compliance with the specifications, technical rules, technical documentation and all legal provisions at the time of purchase · Subject of the contract: The contracting authority is interested in purchasing a…
Show full description
… backhoe loader with accessories under the conditions and in compliance with the technical specifications described in the specifications REQUIREMENTS, MINIMUM TECHNICAL SPECIFICATIONS: Lot I – Wheeled backhoe loader with accessories, all-wheel drive (4x4). Dimensions and masses of max. length 5,800 mm; b. max. width 2,500mm; c. height above the excavation arm max. 3,700 mm; d. height above cab max. 3,200 mm; e. ground clearance min. 350 mm; f. Minimum turning radius max. 3,600 mm; g. maximum authorised total mass max. 9000 kg. Engine a. cylinder capacity 4000 – 5000 cc; b. No. cylinders 4; c. Maximum power min. 100 hp; d. Maximum torque min. 480 Nm; e. Maximum speed min. 35 km/h; f. pollutant emissions Compliance with the pollution norms in force STAGE V; g. Liquid cooling, pressurised with radiator or air; Axles a. Dynamic front axle load min. 8,000 kg; b. Dynamic rear axle load min. 12,000 kg. Loader performance a. breaking force at the bucket min. 6,400 kgf; b. maximum lifting height min. 3,300 mm; Excavator performance a. breaking force at the bucket min 6,100 kgf; b. Maximum digging depth min. 5,700 mm; c. maximum discharge height min. 4,600 mm. Transmission a. gearbox - AUTOSHIFT type - designed and built specifically for backhoe loaders, with synchronization of gear changes in all gears - electric control for selecting the direction of travel b. front/rear gears Minimum 6/4 c. traction electric control for selecting the drive axles 4x4, 2x4 a. hydrostatic steering on the front axle; b. with emergency prioritisation valve; c. the steering cylinders are placed behind the axle for increased protection. Braking/safety in operation a. with discs immersed in oil, progressive and proportional drive; b. hydraulic actuation; c. Parking brake; Electrical installation a. supply voltage 12 V; b. Indoor-controlled lighting installation; Heating and ventilation installation of air conditioning installation; b. Heating installation; c. With dust/air filter. Hydraulic system a. variable flow hydraulic pump and axial pistons, equipped with an automatic system that adjusts the oil flow according to the working load; b. total hydraulic flow min. 165 l/minute c. max. pressure 255 bar Body a. cab (protected from overturning and falling objects) closed, with ventilation, heating and AC; b. corrosion protection. Color a. paint from the supplier's color palette. Tyres a. dimensions: according to the manufacturer; Equipment / accessories / minimal equipment a. Automatic system that checks during the working day, the following parameters: oil level engine-liquid cooling-liquid windshield-fuel, diesel filter condition, air filter loading degree, engine oil pressure, engine operating temperature; b. System which automatically disengages the front axle when a predetermined travel speed is exceeded; c. System with automatic activation after exceeding the preset travel speed - numbs the load bucket oscillations during travel for better retention
Contract
Type of service
Clement What the numbers say about this buyer
- 48% of this buyer's awards went to companies that had already won here before (272 awards since 2021, spread over 134 companies). That is well below the sector norm (63%) — this buyer switches suppliers more often than others.n = 272 awards since 2021
- The median procedure drew 4 bids (39 procedures with a bid count); 3% ended with a single bidder. Sector: median 2 bids.n = 39
- Across 10 procedures with structured selection criteria, this buyer most often required: Share of subcontractors (10 of 10), Independent quality certificate (e.g. ISO 9001) (10 of 10), Trade register enrolment (10 of 10), Independent environmental certificate (ISO 14001 / EMAS) (9 of 10).n = 10
- 1% of awards went to companies from abroad (272 awards with a known winner country). Sector average: 0%.n = 272
- 1% of the bids received came from other countries (36 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 36
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
în conformitate cu art. 173 alin. (1) din Legea nr. 98/2016, se solicită Certificatul constatator eliberat de O.N.R.C. Certificatul constatator eliberat de O.N.R.C. reprezintă dovada că operatorul economic este legal constituit și că nu se află în niciuna din … read in fullcollapse
Ofertanții, terții și subcontractanții trebuie sa facă dovada implementării unor standarde minime, respectiv: Standarde minime de asigurare a calității - dovada implementării şi menţinerii unui sistem de management al calităţii conform cu cerinţele din stand… read in fullcollapse
Dacă mai mulţi operatori economici depun o oferta comună, aceştia nu au obligaţia legalizării acordului de asociere la momentul depunerii ofertei, ci doar înainte de semnarea contractului, dacă oferta este declarată câștigătoare. În cazul depunerii unei oferte… read in fullcollapse
În cazul în care părți din contractul de achiziție publică urmează să se îndeplinească de unul sau mai mulți subcontractanți, ofertanții vor respecta dispozițiile Legii nr. 98/2016 si ale HG 395/2016. Acordul de subcontractare va face parte din ofertă și se va… read in fullcollapse
În cazul în care operatorul economic își demonstrează capacitatea tehnică și/sau profesională invocând și susținerea acordată în conformitate cu art. 182 din Legea nr. 98/2016 cu modificările și completările ulterioare, de către unul sau mai mulți terți, atunc… read in fullcollapse
în conformitate cu art. 173 alin. (1) din Legea nr. 98/2016, se solicită Certificatul constatator eliberat de O.N.R.C. Certificatul constatator eliberat de O.N.R.C. reprezintă dovada că operatorul economic este legal constituit și că nu se află în niciuna din … read in fullcollapse
Ofertanții, terții și subcontractanții trebuie sa facă dovada implementării unor standarde minime, respectiv: Standarde minime de asigurare a calității - dovada implementării şi menţinerii unui sistem de management al calităţii conform cu cerinţele din stand… read in fullcollapse
Dacă mai mulţi operatori economici depun o oferta comună, aceştia nu au obligaţia legalizării acordului de asociere la momentul depunerii ofertei, ci doar înainte de semnarea contractului, dacă oferta este declarată câștigătoare. În cazul depunerii unei oferte… read in fullcollapse
În cazul în care părți din contractul de achiziție publică urmează să se îndeplinească de unul sau mai mulți subcontractanți, ofertanții vor respecta dispozițiile Legii nr. 98/2016 si ale HG 395/2016. Acordul de subcontractare va face parte din ofertă și se va… read in fullcollapse
În cazul în care operatorul economic își demonstrează capacitatea tehnică și/sau profesională invocând și susținerea acordată în conformitate cu art. 182 din Legea nr. 98/2016 cu modificările și completările ulterioare, de către unul sau mai mulți terți, atunc… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| TEHNIC | 12 | 2024–2026 |
| DEDEMAN S.R.L. | 8 | 2024 |
| UNIVERSAL CONSTRUCT MARKET | 8 | 2024 |
| AG-BROKER DE ASIGURARE SRL | 7 | 2024–2026 |
| METRO CASH & CARRY ROMANIA | 7 | 2024–2026 |
Tactics
When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 442 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 33 (median of 2,802 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Romania · Mining & construction machinery, 7 contracts went to foreign companies over the last 3 years (of 7,546 recorded awards).
Submission language: Romanian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now