How to bid in this country: portals, deadlines, thresholds →
Complete reconstruction of the building and reduction of energy intensity – House of Arts Piešt'any
Kompletná rekonštrukcia budovy a zníženie energetickej náročnosti – Dom umenia Piešťany — original title
Your path to submission
- Deadline: 3 November at 10:00 — 2 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Offer and evidence in: Slovak, Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is the implementation of construction works in the framework of the project ‘Complete reconstruction of the building and reduction of energy intensity – House of Arts Piešt'any’, which aims at the comprehensive restoration of the national cultural monument object, with preservation of the monumental value of the object, improvement of technical condition, safety, operational functionality. The contract includes the execution of construction works on the following construction objects: SO 01 House of Arts SO 02 Landscaping PS 01 Lifts The construction works for SO 01 will be carried out: Circuit cladding Roof structures Exterior filling structures Reconstruction of UK heating Reconstruction of ZTI health technology Reconstruction of VZT ventilation In order to increase the quality of the indoor environment in the building, ventilation with air recovery in the…
Show full description
… canteen is proposed. Reconstruction of CHL cooling Reconstruction of indoor lighting Reconstruction of outdoor lighting Reconstruction of electric Design of EPS and HSP Design of ZODT (Smoke and heat removal device) Design of RES Renewable energy sources – heat pump Design of stage lighting Fire protection of the building As part of the construction work on SO 02, the following will be implemented: Landscaping – roof green Within the operational files for PS 01, the following will be implemented: Dining lift - small freight lift with a load capacity of 100 kg Personal traction lift with a load capacity of 450 kg Personal traction lift, in a disabled version with a load capacity of 630 kg The subject of the contract is described in detail in specific annexes to the tender documents.
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew just one bid (24 procedures with a bid count); 58% ended with a single bidder. Sector: median 5 bids.n = 24
- 35% of this buyer's awards went to companies that had already won here before (24 awards since 2019, spread over 7 companies). 65% went to new names.n = 24 awards since 2019
- 48% of the bids received came from small and medium-sized enterprises (15 procedures with a bid mix). Sector: 79%.n = 15
- 21% of awards went to companies from abroad (24 awards with a known winner country). Sector average: 25%.n = 24
- 0% of the bids received came from other countries (15 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 15
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Slovak, Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Allianz - Slovenská poisťovňa, a.s. | 3 | 2023–2024 |
| PREMIUM Insurance Company Limited | 3 | 2023–2024 |
| KOOPERATIVA poisťovňa, a.s. Vienna Insurance Group | 3 | 2023–2024 |
| Energie2, a.s. | 2 | 2024 |
| Colonnade Insurance S.A. | 2 | 2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,153 completed awards — not a statement about this procedure.)
This procedure allows 29 days between publication and deadline — typical in this country is 30 (median of 773 procedures). A normal window for this market.
Foreign bidders
In Slovakia · Construction work, 82 contracts went to foreign companies over the last 3 years (of 1,143 recorded awards) — mostly from Germany, Czechia, Poland.
Submission language: Slovak, Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now