How to bid in this country: portals, deadlines, thresholds →
Planning for local and regional tourism development
Helyi és térségi turizmusfejlesztés tervezés — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Part 1: Development of the Event Space to achieve a more complex tourist experience Part 2: Expanding the active offer of experiences in the vicinity of the Temple Mount entitled “Local and regional tourism development” Part 3: Villány Experimental Tour related to Active Tourism “Local and Regional Tourism Development” · Part 1: TOP_Plusz‐6.1.3-21 “Development of local and regional tourism” Development of the Event Space to achieve a more complex tourism experience Preparation of permit and construction plan level plans, support of public procurement procedure, design foremanship, and performance of cost expert tasks 1.Development of a space covering on the land parcel of 35 GDRs (GDR 34/6 may also be affected) Development tasks/professional involvement: - Land border management -Geodesia -Transport/drainage of precipitation water -Strong current -Landscape architecture - Examination of…
Show full description
… water abstraction possibility 2.Establishment of a procession area on the north side of a reception building (hrsz 34/6) Development tasks/professional involvement: -Geodesia -Telectronic border management -Transport/drainage -Landscape architecture 3.40 parking lot on land sections 35, 36, 37 Development tasks/professional involvement: -Geodesia -Electronic border management -Transport/drainage -Landscape architecture - Power 4.Renovation of a service road on land section 34/6 Development tasks/sectoral involvement: -Electronic border management - Geodesy -Transport/drainage -Strong current -Landscape architecture 5.Section I of the Ady Endre street promenade - to Tüzép (912/3, 914, possibly 915 GDR) Development tasks/sectoral involvement: -Geodesia -Electronic border management -Transport/drainage -Strong current -Landscape architecture 6.Section II of the Ady Endre street promenade - in front of Tüzép and Tűzoltóőrs (hrsz 914, 913/2, 93/4) Development tasks/sectoral involvement: -Geodesia -Electronic border management -Transport/drainage -Strong current -Landscape architecture 7.Section III of the Ady Endre street promenade - from Tűzoltóőrs to the Railway Station (hrs 919/5, 919/6, 920/1, 923/4) Development tasks/sectoral involvement: -Geodesia -Electronic border management -Transport/drainage -Strong current -Landscape architecture 8.Reception building of the event space (hrsz 34/6) Development tasks/professional involvement: -Master of Construction -Building Engineering -Building Electricity - Power Current - Weak Current - In case of a design proposal Quantities affected by design: A paved surface (walkway) with a length of about 542 m is created to increase the size of the pavement by 1450 m2, and the part behind the Event Space is 750 m2 of paved surface designed. Additional requirements to be taken into account when drawing up the plan: Bicycle storages, - props, - parking lots in the immediate vicinity of the Event Space should be planned in the project. A bicycle rest area to be planned, which provides charging for mobile devices (solar smart bench), provides free Wi-Fi service. Their exact design and location are part of the design task. Support for a public procurement procedure: The task and responsibility of the winning AT as a general designer is to carry out a public procurement procedure for works (compilation of annexes to public procurement documentation, answering questions arising during additional information, checking tenders, participating in evaluation). Designer’s foremanship: He is (also) signing for a winning ATdesigner foremanship. Winning AT is obliged to perform design foremanship and other tasks until the end of the warranty period. The condition of performance is to be available 2 times a month at a place and time agreed with the Contracting Authority during the entire period of physical implementation. Act CLXXXV of 2013 Pursuant to Section 19(4), a planner shall prepare and be responsible for the soundness of cost estimates and cost calculations relating to public works, and for their compliance with the provisions of the architectural and technical documentation, and shall perform the tasks laid down in the Public Procurement Act. the tasks of cost experts specified in Section 22 of the Act. · Part 2: TOP_Plusz‐6.1.3-21 ‘Local and regional tourism development
Contract
Type of service
What you must prove — eligibility criteria
Szakmai tevékenység végzésére vonatkozó alkalmasság előírása [Kbt. 65. § (1) bekezdés c) pont]: Alkalmatlan az Ajánlattevő (közös Ajánlattevők), ha nem rendelkezik (együttesen nem rendelkeznek): SZ.1./ GSZ legyen bejegyezve a cégnyilvántartásba vagy az egyéni … read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.1/ az Ajánlati felhívás feladásától visszafelé számított maximum 6 éven belül megkezdett és 3 éven belül az előírásoknak é… read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.2/ legalább az alábbi végzettséggel, képzettséggel rendelkező szakemberrel: M.2.1./ legalább 1 fő tervezővel, aki, Közleke… read in fullcollapse
Szakmai tevékenység végzésére vonatkozó alkalmasság előírása [Kbt. 65. § (1) bekezdés c) pont]: Alkalmatlan az Ajánlattevő (közös Ajánlattevők), ha nem rendelkezik (együttesen nem rendelkeznek): SZ.1./ GSZ legyen bejegyezve a cégnyilvántartásba vagy az egyéni … read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.1/ az Ajánlati felhívás feladásától visszafelé számított maximum 6 éven belül megkezdett és 3 éven belül az előírásoknak é… read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.2/ legalább az alábbi végzettséggel, képzettséggel rendelkező szakemberrel: M.2.1./ legalább 1 fő tervezővel, aki, Közleke… read in fullcollapse
Szakmai tevékenység végzésére vonatkozó alkalmasság előírása [Kbt. 65. § (1) bekezdés c) pont]: Alkalmatlan az Ajánlattevő (közös Ajánlattevők), ha nem rendelkezik (együttesen nem rendelkeznek): SZ.1./ GSZ legyen bejegyezve a cégnyilvántartásba vagy az egyéni … read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.1/ az Ajánlati felhívás feladásától visszafelé számított maximum 6 éven belül megkezdett és 3 éven belül az előírásoknak é… read in fullcollapse
Ajánlatkérő alkalmatlannak minősíti az Ajánlattevőt (vagy közös ajánlattevőket), ha nem rendelkezik (vagy együttesen nem rendelkeznek): M.2/ legalább az alábbi végzettséggel, képzettséggel rendelkező szakemberrel: M.2.1./ legalább 1 fő tervezővel, aki, Közleke… read in fullcollapse
Tender documents — direct download
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 1,150 completed awards — not a statement about this procedure.)
This procedure allows 32 days between publication and deadline — typical in this country is 30 (median of 664 procedures). A normal window for this market.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,146 recorded awards) — mostly from Germany, United Kingdom, Austria.
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now