Przebudowa i rozbudowa oczyszczalni ścieków zlokalizowanej w Olsztynie k. Częstochowy przy ul. Storczykowej
Poland · Olsztyn · how to bid here →
Your path to submission
- Deadline: 21 October at 10:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (39 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to KAMBERG Sp. z o.o..n = 39
- The median procedure drew 2 bids (7 procedures with a bid count); 43% ended with a single bidder. Sector: median 5 bids.n = 7
- 31% of this buyer's awards went to companies that had already won here before (98 awards since 2021, spread over 66 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 98 awards since 2021
- Across 5 procedures with structured selection criteria, this buyer most often required: References: works (5 of 5), Staff qualifications (5 of 5).n = 5
- Not one of the 98 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 98
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 5 (from 4,957 awards).
What the buyer is looking for
1.The subject of the order is: Reconstruction and extension of a wastewater treatment plant located in Olsztyn near Częstochowa at ul. Orchid. A detailed description of the subject-matter of the contract is set out in Chapter III of the tender specifications, the design and cost documentation and the draft contractual provisions (Annexes 12A and 12B to the tender specifications). 3.The work must be carried out while ensuring the continuous operation of the treatment plant. In the first stage of implementation, the contracting authority recommends carrying out construction works related to the extension of the wastewater treatment plant (new facility), enabling the biological treatment process to be carried out and obtaining a partial occupancy permit, and then proceed with the execution of the remaining construction works, so as to ensure continuity of wastewater collection and…
Show full description
… treatment. Reconstruction and extension must not interfere with the operation of the wastewater treatment plant. Possible shutdowns and changes in the operating cycles of the equipment should be agreed with the City and Municipality of Olsztyn and Przedsiębiorstwo Wodociągów i Kanalizacji Okręgu Częstochowskiego S.A., as well as obtain the consent of the Supervision Inspector in writing. 4.Note: The Contractor, when submitting a tender, is obliged to present in the tender form the separate costs of implementation of: refurbishment of waste water treatment plants (Part A); extension of waste water treatment plants (Part B) The contracting authority does not allow the submission of partial tenders. 5.The scope of works on the reconstruction of the wastewater treatment plant is financed by Przedsiębiorstwo Wodociągów i Kanalizacji Okręgu Częstochowskiego S.A. The basis for the valuation is the design and implementation documentation – part A. 6.The scope of works on the extension of the wastewater treatment plant is financed by the City and the Municipality of Olsztyn. The basis for the valuation shall be the design and implementation documentation — Part B. 7. LOCAL VISION: The contracting authority shall require, in accordance with Article 131(1)(b) CTMR, that: 2 point 1 of the Public Procurement Law, in order to obtain all the data and information necessary for the proper performance of the contract and the correct calculation of the tender price, before submitting the tender, the Contractor should carry out a local inspection of the site and the facility on which the works covered by the subject of the contract will be carried out. The presence of the Contractor on the on-site visit is mandatory and requires confirmation of this fact by an appropriate document – specimen Annex 13 to the tender specification. Failure to submit a declaration on completion of the on-site visit together with the tender constitutes a ground for rejecting the Contractor’s tender referred to in Article 226(1)(b) CTMR. 1 point 18 of the Public Procurement Law, the Contracting Authority informs that it will verify the declaration submitted to the tender with a list of persons-representatives of contractors present on visions within the deadlines set by the Contracting Authority. 8.The City and Municipality of Olsztyn informs that the reconstruction and extension of the wastewater treatment plant located in Olsztyn near Czestochowa at ul. Storczykowa is co-financed by the European Union in the scope of construction works for the extension of wastewater treatment plants. The City and Municipality of Olsztyn, in the present proceedings, acts as an authorised Contracting Authority on the basis of the agreement of 9 February 2026, to prepare and conduct a joint procedure on behalf of and for the benefit of Przedsiębiorstwo Wodociągów i Kanalizacji Okręgu Częstochowskiego S.A. Contracts with the Contractor will be concluded: a separate contract between the Contractor and the City and Municipality of Olsztyn and a separate contract between the Contractor and Przedsiębiorstwo Wodociągów i Kanalizacji Okręgu Częstochowskiego S.A. Each Contracting Authority will make payments related to the performance of the contract on the basis of separate invoices issued separately for each of the contracts concluded. · 1.The subject of the order is: Reconstruction and extension of a wastewater treatment plant located in Olsztyn near Częstochowa at ul. Orchid. 2.A detailed description of the subject-matter of the contract is set out in Chapter III of the Terms of Reference, the design and cost documentation and the draft contractual provisions (Annexes 12A and 12B to the Terms of Reference).
What you must prove — eligibility criteria
O udzielenie zamówienia może ubiegać się Wykonawca, który wykaże, że: a) posiada środki finansowe lub zdolność kredytową w wysokości nie mniejszej niż 10 000 000,00 PLN (słownie: dziesięć milionów złotych 00/100) W przypadku Wykonawców wspólnie ubiegających si… ▸▾
O udzielenie zamówienia może ubiegać się Wykonawca, który wykaże, że posiada wiedzę i doświadczenie niezbędne do wykonania przedmiotu zamówienia, tj. a1) wykonał nie wcześniej niż, w okresie ostatnich dziesięciu lat, a jeżeli okres prowadzenia działalności jes… ▸▾
O udzielenie zamówienia może ubiegać się Wykonawca, który wykaże, dysponuje lub będą dysponować osobami zdolnymi do wykonania zamówienia, które będą uczestniczyć w wykonaniu zamówienia tj. posiadającymi prawo do wykonania samodzielnej funkcji technicznych w bu… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiortswo Handlowo-Usługowe LARIX Sp. z o.o. | 4 | 2021–2024 |
| Usługi Transportowe Ilona Biskup | 4 | 2022–2025 |
| Usługi Transportowe Stanisław Biskup | 4 | 2022–2025 |
| myORLEN | 4 | 2022–2024 |
| Działalność Usługowa Jan Weżgowski | 3 | 2023–2025 |