Raamovereenkomst 3B Systeemintegrator Programma Beweegbare Bruggen
Netherlands · UTRECHT · how to bid here →
Your path to submission
- Deadline: 21 December at 10:00 — 75 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (39 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to JMA.n = 39
- The median procedure drew 3 bids (617 procedures with a bid count); 19% ended with a single bidder. Sector: median 5 bids.n = 617
- 5% of this buyer's awards went to companies that had already won here before (725 awards since 2015, spread over 311 companies). 95% went to new names.n = 725 awards since 2015
- The award came in at a median 86% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 21
- 11% of awards went to companies from abroad (725 awards with a known winner country). Sector average: 8%.n = 725
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 128 contracts went to foreign companies over the last 3 years (of 2,675 recorded awards) — mostly from Germany, France, United Kingdom.
Submission language: NLD.
Typical field: median 5 (from 33 awards).
What the buyer is looking for
Utrecht has a number of movable bridges, which are important links for the city when it comes to nautical accessibility and accessibility for road traffic. The Programme Movable Bridges (PBB) of the municipality of Utrecht is about, among other things, the file formation and modernization of the electro-mechanically movable bridges and the municipal control center on the Vaartscherijnstraat. This Tender Guide is part of the tender procedure for the contracting of a 3B System Integrator for the Movable Bridges Programme of the municipality of Utrecht. 3B refers to the installations for the operation, control and monitoring of the bridges. The municipality of Utrecht1 wants to conclude one Framework Agreement for a 3B System Integrator (3B-SI) for the Movable Bridges Programme. Expected scope of the Framework Agreement: The municipality expects to purchase products and services over the…
Show full description
… entire term (maximum 10 years) of the Framework Agreement with an expected total value of € 9,400,000. Maximum size (or: Limitation) of the Framework Agreement: The municipality purchases products and services during the term of the Framework Agreement, with a maximum total value of € 12,700,000. As soon as the maximum amount is reached, the Framework Agreement ends automatically. You cannot derive any rights from these values.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Jos Scholman Groen B.V. | 8 | 2024–2026 |
| BAM Infra B.V. | 5 | 2024–2026 |
| Gebroeders M. en W. Bron B.V. | 3 | 2024–2026 |
| A. Agterberg B.V. | 3 | 2024–2025 |
| Schreuders Groen B.V. | 2 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.