Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

ZV - Rödental - General Renovation Town Hall - Interior Plastering

ZV - Rödental - Generalsanierung Rathaus - Innenputzarbeiten — original title

DEGermany · Rödental

Your path to submission

  1. Deadline: 2 November at 09:00 — 1 day left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: German.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Interior plastering · 2,850 sqm bonding bridge 650 sqm burn-up barrier 200 m installation slots fill 450 sqm compensating plaster lime cement 350 m edge profiles 550 sqm advance lime plaster 2,340 sqm lime plaster 520 sqm lime cement plaster 425 sqm lime smoothness

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published5 Oct 2026
ProcedureOpen procedure
Contract period30 Dec 2026 → 2 Jul 2027
Place of performanceRödental
EU-fundedReserved for SMEs

Type of service

45 · Construction work
CPV 45410000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 5 months (55 awards, most recently August 2026) — the next award is due around January 2027 by that rhythm. The last award went to Riedel, Marcus Holzmanufaktur GmbH.n = 55
  • 44% of this buyer's awards went to companies that had already won here before (79 awards since 2019, spread over 45 companies). 56% went to new names.n = 79 awards since 2019
  • The median procedure drew 3 bids (78 procedures with a bid count); 23% ended with a single bidder. Sector: median 4 bids.n = 78
  • Not one of the 79 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 79
  • 0% of the bids received came from other countries (22 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 22

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

What you must prove — eligibility criteria

›
References: works
https://www.tender24.de/NetServer/SelectionCriteria/54321-Tender-1a0ecfa87d6-2b043eb612ee37e9
›
Professional liability insurance
https://www.tender24.de/NetServer/SelectionCriteria/54321-Tender-1a0ecfa87d6-2b043eb612ee37e9
›
Average minimum annual turnover
https://www.tender24.de/NetServer/SelectionCriteria/54321-Tender-1a0ecfa87d6-2b043eb612ee37e9
Requirement texts are quoted in the notice's original language — only the official wording is binding.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
MAN Truck und Bus Deutschland GmbH · München42024
Bischoff-LS Luft- und Klimatechnik GmbH42019–2026
JMF Metallbautechnik GmbH32019–2026
Wengertsmann Bau GmbH · Nürnberg32025
BSB Spezialgerüstbau GmbH32025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

33
2019
9
2020
28
2022
9
2023
20
2024
44
2025
2
2025
41
2026
186 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 09:00

Tactics

When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 55 completed awards — not a statement about this procedure.)

This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.

Submission language: German.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Put together the evidence — in German
The 3 criteria on the left, plus your price.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now