How to bid in this country: portals, deadlines, thresholds →
Training hall construction, Che
Výstavba tréninkové haly, Che — original title
Your path to submission
- Deadline: 5 November at 10:00 — 4 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The foundations, including piles and retaining walls, are reinforced concrete. The hall and vestibule has a designed galvanized steel frame structure. The balcony at the level of the existing hall and vestibule will consist of a concrete slab on a steel structure and columns. The staircase will be from the airfields. The door will be sectional, insulated with electric drive. The door will be aluminum. The perimeter sheath will be based on a concrete threshold with insulation and will be made of light panels of sheet metal-mineral wadding-sheet, as well as a roof. At the vestibule, the roof of the small gradient will be supplemented with a roofing foil for flat roofs. In the training hall there will be distribution of fire water supply, gas pipeline to heating units, electricity to lighting, sockets and sports equipment. The connection of the fire main will be in the hallway of the…
Show full description
… existing hall near the elevator. Due to the reduction of pressure losses, the pipeline will be established a new one in the existing route from HUP. The gas meter and connection of the existing gas boiler in the hall will be in the existing location. Electricity will be connected in the substation of the existing hall. Heating and ventilation will be provided by four heating and ventilation units (Sahary) 29.8kW. The exhaust air from the hall area is provided by a fan of 8000 m3/h with a duct to ensure uniformity of the exhaust.
Contract
Type of service
Clement What the numbers say about this buyer
- 25% of this buyer's awards went to companies that had already won here before (122 awards since 2015, spread over 34 companies). That is well below the sector norm (75%) — this buyer switches suppliers more often than others.n = 122 awards since 2015
- In this sector the buyer awards roughly every month (3 awards, most recently January 2026) — by that rhythm the next award was due around February 2026. The last award went to ISSO - Inženýrské stavby Sokolov, s. r. o.n = 3
- The median procedure drew 3 bids (95 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 95
- 16% of awards went to companies from abroad (122 awards with a known winner country). Sector average: 7%.n = 122
- The award came in at a median 85% of the estimated value (33 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 33
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| unipap plus s.r.o. | 16 | 2023–2025 |
| DOSTA s.r.o. | 7 | 2022–2026 |
| KANONA a.s. | 4 | 2025 |
| AV MEDIA SYSTEMS, a.s. | 3 | 2022–2025 |
| Zahradní a parková spol. s r.o. | 2 | 2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 15,064 completed awards — not a statement about this procedure.)
This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). A normal window for this market.
Foreign bidders
In Czechia · Construction work, 143 contracts went to foreign companies over the last 3 years (of 16,823 recorded awards) — mostly from Germany, Poland, France.
Submission language: Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now