Vernieuwen van de trambaan in eigen bedding tussen de Kolegemstraat en de eindhalte Wondelgem, t.h.v. de R4
Belgium · Mechelen · how to bid here →
Your path to submission
- Deadline: 9 November at 11:00 — 37 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (3 awards, most recently March 2024) — by that rhythm the next award was due around April 2024. The last award went to Strukton Rail.n = 3
- 33% of awards went to companies from abroad (109 awards with a known winner country). Sector average: 10%.n = 109
- 1% of this buyer's awards went to companies that had already won here before (109 awards since 2015, spread over 39 companies). That is well below the sector norm (14%) — this buyer switches suppliers more often than others.n = 109 awards since 2015
- The median procedure drew 2 bids (7 procedures with a bid count); 14% ended with a single bidder. Sector: median 4 bids.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Belgium · Construction work, 233 contracts went to foreign companies over the last 3 years (of 2,587 recorded awards) — mostly from France, Germany, Netherlands.
Submission language: NLD.
Typical field: median 4 (from 1,498 awards).
What the buyer is looking for
The subject of this contract is: the renewal of the tramway in its own bed between the Kolegemstraat and the final stop Wondelgem, with respect to the R4. A detailed description of this contract can be found in section 3 ‘Technical and/or functional specifications’ of these specifications. · See assignment document
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Autobus Kruger bvba | 2 | 2015 |
| CARCOSMETIX | 1 | 2025 |
| VAN LOOCK MOTOREN | 1 | 2025 |
| Parmentier Autobus NV | 1 | 2015 |
| Darvan bv | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.