Egri elkerülő út eng. és kiviteli tervek készítése
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 15 October at 12:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (157 awards, most recently April 2026) — by that rhythm the next award was due around June 2026. The last award went to FŐMTERV Mérnöki Tervező Zrt..n = 157
- 46% of this buyer's awards went to companies that had already won here before (268 awards since 2017, spread over 126 companies). 54% went to new names.n = 268 awards since 2017
- The median procedure drew 5 bids (257 procedures with a bid count); 1% ended with a single bidder. Sector: median 5 bids.n = 257
- Across 11 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (10 of 11), Technical staff for quality control (9 of 11), Average minimum turnover in the contract field (9 of 11), References: works (7 of 11).n = 11
- 6% of awards went to companies from abroad (268 awards with a known winner country). Sector average: 4%.n = 268
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 28/09/2026.
Foreign bidders
In Hungary · Architecture & engineering, 25 contracts went to foreign companies over the last 3 years (of 1,101 recorded awards) — mostly from Germany, United Kingdom, France.
Submission language: HUN.
Typical field: median 5 (from 157 awards).
What the buyer is looking for
Preparation of the permitting and export plans of the Eger bypass road according to the technical content specified in the design task description to be published as part of AD. · Starting from the roundabout junction of the M25 motorway, the Eger bypass road leads on the eastern side of the city of Eger, providing a connection between the main roads 25 and 24, and bypassing the Felnémet district, it connects to the main road 25. Tasks: Preparation of complete permitting plans with decision preparation documentation laying the foundation for its details and certain technical parameters, permitting, preparation of feasibility studies, and preparation, permitting and approval of complete construction plans, according to the technical content specified in the design task description to be published as part of AD. The main estimated quantities are, for information purposes: Approximately 17…
Show full description
… km of national roads with a planned length of ~1.4 km with 2x2 lanes (with the reconstruction of the existing 2x1 lane road), ~15.6 km of national roads with a continuous length of 2x1 lanes (designed on a new route). The project includes the planning of about 9 km of local roads (~6 km of new tracks, ~3 km of pavement reinforcement), 13 roundabout junctions (of which 3 turbo-circular junctions), the planning of the reconstruction of 7 level junctions, the construction of 12 simple or vehicle-classified junctions, the construction of 6 new structures, the reconstruction of 3 existing structures and the construction of 1 rail-level connection. Among the structures, a new national road bridge with 2x2 lanes above the railway has a planned maximum structural length of 81.8 m. The project also includes the design of handrails, retaining walls and notches on certain sections of the bypass, the design of cycle path sections (new trail, ~1 km length), the design of a footpath and pavement (2.7 km length) and the design of 2 pedestrian crossing points. The winning tenderer shall participate in the public procurement procedures to be carried out for the execution of the works on the basis of the Plans drawn up by it or part thereof, as detailed in the draft contract. In the case of full-scale permitting and full-scale construction plans, building information model (BIM)-based planning is carried out in accordance with Decree 31/2024. (VIII. 22.) in accordance with the CCM Decree. BIM requirements are included in the design task description. The contracting authority draws attention to the fact that - the basic tasks to be carried out within the framework of the contract to be concluded as a result of this procedure are the preparation of the Decision Preparation Documentation, the Feasibility Study and the full Licensing Plans, and obtaining permits; - the Contractual Agreement to be issued as part of AD contains a separate entry into force condition for the preparation of the complete Export and Tender Plans and Volumes III, IV and V of the (public) procurement documentation suitable for construction. with regard to Section 41(1); - Act V of 2013 on the Civil Code Designer’s foremanship, as defined in Section 19(1), arising at the stage of the implementation of the public works, shall be exercised as an option (for more information, see: ‘II.2.11) Information on options’, field BT-53). The task of the successful tenderer in the framework of the design foremanship is to: - monitor the implementation of the project, - check the implementation of the implementation plan documentation prepared by it, - draw attention to the factors that hinder or facilitate the implementation according to the plan, - propose professional solutions to technical uncertainties and problems arising during the implementation, - facilitate the resolution of professional issues arising during the implementation and in connection with the implementation plan documentation. A detailed description of the task is provided in the design task description.
What you must prove — eligibility criteria
SZ/1.) A Kbt. 65. § (1) bekezdés c) pontja és a Kr. 26.§ (1) bekezdés b) pontja, valamint a 322/2015 (X.30.) Korm. rendelet 8.§ (1)-(2) bekezdése alapján ajánlatkérő az ajánlattevő vonatkozásában előírja az építési beruházáshoz kapcsolódó tervezői szolgáltatás… ▸▾
Igazolási mód: A Kbt. 67. § (1)-(3) bekezdése szerint az AT ajánlatában köteles az alkalmassági követelményeknek való megfelelés tekintetében az egységes európai közbeszerzési dokumentumba (EEKD) foglalt nyilatkozatát benyújtani. AK az EEKD IV. részében szerep… ▸▾
Igazolási mód: A Kbt. 67. § (1)-(3) bekezdése szerint az AT ajánlatában köteles az alkalmassági követelményeknek való megfelelés tekintetében az egységes európai közbeszerzési dokumentumba (EEKD) foglalt nyilatkozatát benyújtani. AK az EEKD IV. részében szerep… ▸▾
Az alkalmasság minimumkövetelményei: M/1.) Alkalmatlan az AT (közös AT), ha nem rendelkezik az eljárást megindító felhívás feladásától visszafelé számított 6 évben (72 hónap) teljesített, de legfeljebb 9 éven (108 hónap) belül megkezdett, az előírásoknak megfe… ▸▾
Az alkalmasság igazolásának módja: A Kbt. 67. § (1)-(3) bekezdése szerint ajánlattevő az ajánlatában köteles az alkalmassági követelményeknek való megfelelés tekintetében az egységes európai közbeszerzési dokumentumba (EEKD) foglalt nyilatkozatát benyújtani. A… ▸▾
Az alkalmasság minimumkövetelménye(i): M/2.) Alkalmatlan az Ajánlattevő (közös ajánlattevő), ha nem rendelkezik M/2.1) legalább 1 fő „projektvezető” szakemberrel, aki a) a 266/2013. (VII.1.) Korm. rendelet szerinti „KÉ-K” vagy azzal egyenértékű tervezői jogosu… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| RODEN Mérnöki Iroda Korlátolt Felelősségű Társaság | 16 | 2023–2026 |
| FŐMTERV Mérnöki Tervező Zrt. | 13 | 2023–2026 |
| UTIBER Közúti Beruházó Kft | 11 | 2023–2026 |
| Pannonway Építő Kft. | 11 | 2023–2026 |
| UNITEF'83 Műszaki Tervező és Fejlesztő Zártkörűen Működő Részvénytársaság | 10 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.