How to bid in this country: portals, deadlines, thresholds →
Operation of BNM's Electrical Network 2027-2030
BNM Villamos hálózatának üzemeltetése 2027-2030 — original title
Your path to submission
- Deadline: 2 November at 12:00 — 1 day left.
- You submit on EKR — not here and not by e-mail. ↗
- Offer and evidence in: Hungarian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Bábolna Nemzeti Ménesbirtok intends to entrust the standby tasks of the electricity supply system under its asset management, as well as the repair work caused by malfunctions, and the performance of scheduled maintenance and renovation tasks, to a company. Standby time: On working days, weekly rest days, Sundays and public holidays from 0 to 24 hours. Facilities and equipment subject to stand-by duty, extent of stand-by duty: - I-II-III. starting from Kisigmánd 120 kV station 22 kV backbone lines, including terminals of the aerial coupling equipment, - Transformer stations listed in Annex 1 (including the part up to the 0.4 kV terminals) - Dióspuszta external /Tata-Mocsa 22 kV line starting from the junction/ and the internal 22 kV line - 22 kV elements in front of the transformer stations - Dióspuszta Ménes, Ölbő, Csikótelep's internal 0.4 kV network and switching equipment. - The area…
Show full description
… bounded by the internal 0.4 kV power transmission network of the facilities in the property management of the Stud Estate - Park and public lighting / showroom, Rákóczi u. Jókai u.-Erzsébet u.- Tárkányi u.- Mészáros u./. Working standards: The troubleshooting, repair and maintenance work to be carried out on the devices and facilities of the electrical network must be carried out on the basis of the relevant standards and professional regulations, which the contractor is obliged to consult in advance. Minimum number of persons required to maintain daily readiness: 1 driver on standby (permanent mobile phone availability) 2 persons 20 and 0.4 kV network mechanic Method of notification of a fault on the electrical network: The E.ON., the Bábolna National Stud Farm or the facilities supplied with the electricity network shall notify the stand-by employee of the contractor by telephone on the telephone provided by the contractor. Requirement to correct a fault in the electrical network: In view of the fact that there are also livestock farms on the power grid where short-term power cuts can lead to the death of animals there, the elimination of malfunctions or other causes should be started as soon as possible and completed as soon as possible. Remuneration for standby duty and work carried out: The consideration for work performed during the standby period is included in the standby fee, excluding the cost of built-in materials. Planned maintenance on the electricity network is remunerated at the unit price specified in the contract for the given device or equipment to be concluded after the public procurement. The remuneration of ad hoc repairs to be carried out on the electricity network shall take into account the hourly rate set out in the contract to be concluded following the public procurement. The materials to be incorporated may be accounted for in accordance with the actual material use certified by the Bábolna National Stud Farm. Duration of the contract to be concluded: The contract to be concluded is valid for a limited period of /4 years after the successful completion of the public procurement. Details of the maintenance, operation and repair works of the electricity supply system in the property management of the Bábolna National Stud Farm: 22 kV network and transformer stations: • planned maintenance work of network and transformer stations, • operation – repair – troubleshooting work, • standby service, • individual compensation of transformers. 0,4 kV network, street and square lighting: • maintenance of overhead line, cable network, • maintenance of low-voltage closed and outdoor control cabinets, • regular repair of space and public lighting, • operation, troubleshooting work, • provision of standby service, • inspection and maintenance of phase repair equipment and its accessories. The 0.4 kV network covers the entire network without any specific details, except for hatching plants II-III-IV-V, mixing plants I-II and former BCR, crop dryers, poultry and pig farms and Mell
Contract
Type of service
Clement What the numbers say about this buyer
- 42% of this buyer's awards went to companies that had already won here before (61 awards since 2018, spread over 9 companies). 58% went to new names.n = 61 awards since 2018
- The median procedure drew 3 bids (57 procedures with a bid count); 7% ended with a single bidder.n = 57
- 7% of awards went to companies from abroad (61 awards with a known winner country).n = 61
- 0% of the bids received came from other countries (34 procedures with a bid mix) — all bidders, not just the winners.n = 34
- 27% of the bids received came from small and medium-sized enterprises (34 procedures with a bid mix).n = 34
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
M1. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik a felhívás feladása napjától visszafelé számított három évben (36 hónapos időszakban) teljesített egy vagy több legalább összesen 24 hónap időtartamú középfeszültségű erősáramú hálózat üzemeltetési ell… read in fullcollapse
M2. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik legalább 1 fő szakemberrel, aki okleveles villamos mérnöki vagy azzal egyenértékű diplomával rendelkezik. A Kbt. 65. § (6) bekezdése szerint az M2. alkalmassági követelménynek a közös ajánlattevők együ… read in fullcollapse
M3. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik legalább 1 fő szakemberrel, aki villamos alállomás kezelő vagy azzal egyenértékű szakképesítéssel rendelkezik. A Kbt. 65. § (6) bekezdése szerint az M3. alkalmassági követelménynek a közös ajánlattevők… read in fullcollapse
M4. Alkalmatlan az ajánlattevő, amennyiben Nem rendelkezik a szolgáltatás ellátásához legalább az alábbi eszközökkel: - 2 db terepjáró képességű gépjármű; - 2 db terepjáró képességű emelőkosaras gépjármű; - 1 db terepalakításra (pl. árokásás, kábelfektetés, … read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| KITE Mezőgazdasági Szolgáltató és Kereskedelmi Zártkörűen Működő Részvénytársaság | 8 | 2024–2026 |
| IKR Agro-Vár Mezőgazdasági és Szolgáltató Korlátolt Felelősségű Társaság | 7 | 2024–2025 |
| PROVENTUS TRADE Mezőgazdasági Kereskedelmi Korlátolt Felelősségű Társaság | 6 | 2024–2026 |
| IKR Agrár Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 5 | 2026 |
| MVM Next Energiakereskedelmi Zrt. | 4 | 2024–2025 |
Tactics
This procedure allows 32 days between publication and deadline — typical in this country is 30 (median of 683 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Hungary, 322 contracts went to foreign companies over the last 3 years (of 21,931 recorded awards) — mostly from Germany, Czechia, Croatia.
Submission language: Hungarian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now