‘Implementation of works for the objective: ‘Strengthening and restoring the road on DN 73D adjacent to km 46+200’
“Executie lucrari pentru obiectivul: ”Consolidare si refacere drum pe DN 73D adiacent km 46+200””
Romania · Bucuresti · how to bid here →
Your path to submission
- Deadline: 22 October at 15:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (982 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to TRIPOL SISTEM CONSTRUCT.n = 982
- The median procedure drew 3 bids (3,037 procedures with a bid count); 21% ended with a single bidder. Sector: median 5 bids.n = 3,037
- 56% of this buyer's awards went to companies that had already won here before (4,145 awards since 2018, spread over 652 companies). 44% went to new names.n = 4,145 awards since 2018
- The award came in at a median 92% of the estimated value (66 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 66
- 84% of the bids received came from small and medium-sized enterprises (1,913 procedures with a bid mix). Sector: 65%.n = 1,913
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Romania · Construction work, 165 contracts went to foreign companies over the last 3 years (of 78,814 recorded awards) — mostly from France, Italy, Germany.
Submission language: RON.
Typical field: median 4 (from 804 awards).
What the buyer is looking for
Execution of works for the objective: "Consolidation and restoration of the road on DN 73D adjacent to km 46+200" A. According to Article 160(1) of Law 98/2016, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications/additional information in relation to the Award Documentation is: - the first deadline is 26 days before the deadline for submission of tenders; - the second deadline is 18 days before the deadline for submission of tenders. B. In accordance with Article 160(2) of Law 98/2016, the Contracting Authority shall set two deadlines within which it shall respond clearly and completely to all requests for clarifications/additional information: - the first deadline is 20 days before the deadline for submission of tenders; - the second deadline is 12 days before the deadline for submission of…
Show full description
… tenders. Depending on the complexity of the clarification requests addressed by the economic operators, for which the answers should be published at the first deadline indicated above, the Contracting Authority reserves the right to publish the answers to those clarifications at the second deadline set in the Award Documentation. The deadlines for replying to the clarifications have been set in such a way that the economic operators have an adequate period for analysing the Award Documentation and, subsequently, for drawing up the tenders in the light of the answers provided by the Contracting Authority. C. Any request for clarification submitted after the date mentioned in point A will make it impossible for the CA to provide an answer and as a result will be considered TARDIVA. D. Any request for clarifications must be submitted in SEAP (www.e-licitatie.ro). · The objective to which the realization of the works contributes is the consolidation and restoration of the road part of DN 73D, km area. 46+200, on the radius of Mioarele, on the right bank of the Argesel River.
What you must prove — eligibility criteria
Operatorii economici ce depune oferta trebuie sa dovedeasca o forma de inregistrare in conditiile legii din tara de rezidenta, sa reiasa ca acesta este legal constituit, ca nu se afla in niciuna dintre situatiile de anulare a constituirii precum si faptul ca a… ▸▾
CERINTA 1 EXPERIENTA SIMILARA PRIVIND LUCRARILE CE FAC OBIECTUL CONTRACTULUI: Ofertantul unic / Ofertantul asociat / tertul sustinator / subcontractantul* ce depune oferta trebuie sa demonstreze ca a executat in ultimii 5 ani** lucrari similare*** cu cele care… ▸▾
SE VA PRECIZA PROCENTUL DIN CONTRACT PE CARE OPERATORUL ECONOMIC INTENTIONEAZA SA IL SUBCONTRACTEZE, DACA ESTE CAZUL. In cazul in care ofertantul va subcontracta o parte din contract, ofertantul are obligatia de a completa DUAE, "Criterii de selectie" - Sectiu… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| LOIAL IMPEX | 81 | 2024–2026 |
| OYL COMPANY HOLDING AG S.R.L. | 70 | 2024–2026 |
| VESTA INVESTMENT | 66 | 2024–2026 |
| SC EDIL CONTRACT SRL | 65 | 2024–2026 |
| TRANSPOL SERVICE | 60 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.