„Sukcesywna dostawa polimeru w postaci płynnej i stałej” – z podziałem na 3 części.
Poland · Zakopane · how to bid here →
Your path to submission
- Deadline: 23 October at 10:00 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL, POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 32% of this buyer's awards went to companies that had already won here before (23 awards since 2024, spread over 16 companies). That is well below the sector norm (54%) — this buyer switches suppliers more often than others.n = 23 awards since 2024
- The median procedure drew 2 bids (21 procedures with a bid count); 43% ended with a single bidder. Sector: median 2 bids.n = 21
- Not one of the 23 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 23
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Chemical products, 57 contracts went to foreign companies over the last 3 years (of 7,385 recorded awards) — mostly from Germany, Bulgaria, France.
Submission language: POL.
Typical field: median 2 (from 1,330 awards).
What the buyer is looking for
1. The subject of the contract is the successive delivery of polymer (flocculator) in liquid and solid form with transport included in the price to the Ordering Party's headquarters, divided into 3 parts: 1.1. Part 1: Supply of polymer in liquid form for disc thickeners. 1.2. Part 2: Supply of polymer in liquid form for screw presses. 1.3. Part 3: Supply of solid polymer for belt presses. 2. During the term of the contract, the Ordering Party provides for the purchase of: 2.1. Part 1: Liquid polymer package for compactors up to 5 000 kg, 2.2. Part 2: Liquid polymer package for screw presses up to 16,000 kg, 2.3. Part 3: Polymer package in solid form for belt presses up to 6,000 kg. 3. Product characteristics and delivery: Products must be suitable for handling biological sediments and have biodegradable properties. 3.1. This supply includes: (a) Supply of a liquid polymer package (Part…
Show full description
… 1) for use in the mechanical concentration of excess sludge: - Purpose: pre-concentration of sewage sludge on a mechanical compactor. - Demonstrate a reference that the products used do not adversely affect biological processes in biological reactors and fermentation chambers, - Hydration of sediments in the broadcast approximately : 99%, - Final hydration of sediments: ≤ 96% - Consumption of polymer up to 6-7 g/xm of sludge - Slurry in effluent not more than 500 g/m3 b) Supply of the polymer package in liquid or solid form (Part 2) - Sludge press: - Purpose: dehydration of sewage sludge on a screw filter press, - Hydration of sludge in the broadcast about: 98.2%, - Final sediment hydration: ≤ 81%, - Consumption of polymer up to 10g/xm of sludge - Slurry in effluent not more than 600 g/m3 c) Supply of solid polymer package (Part 3) - Sludge press: - Purpose: dehydration of sewage sludge on a belt filter press, - Hydration of sludge in the broadcast approximately: 98.2%, - Final sediment hydration ≤81%, - Polymer consumption up to 10 g/xm of sediment - Slurry in leachate not more than 600 g/m3 4.Please be advised that the sediment subject to dehydration on the filter press is a digestate with variable sediment character and possible fermentation. Digestate in the range of 65-75% of dry organic matter. 5.Liquid polymer 3.4.1.a) is used for excessive sediment in the range of 70-88% dry organic matter. 6.Technical test: 6.1. Polymers should be selected taking into account technological solutions and the actual characteristics of the Ordering Party's sediments. 6.2. The Contractor must carry out technical tests at his own expense before submitting his tender. 6.3. The tests will be carried out by the Contractor with the participation of the Ordering Party. 6.4. The Contractor is obliged to perform technical tests of sludge dewatering in the Contracting Authority's treatment plant. 6.5. The report on the completion of the tests (Annex 5 to the tender specification) at the contracting authority’s waste water treatment plant, signed by the persons participating in the tests (both the potential contractor and the contracting authority’s representative), must be attached to the tender. The test report must contain at least: the date of the tests, the names of the representatives of the Contracting Authority and the Contractor present during the tests, the name of the polymer tested, the hydration effect (in %), the dose at which the indicated hydration effect was obtained, the number of tests carried out. 6.6. The Contracting Authority shall allow Contractors to carry out tests before submitting tenders in order for Contractors to familiarise themselves with the place where the service is to be provided, as well as to obtain, on their own responsibility and risk, all the information necessary for the preparation of the tender. 6.7. Analytical tests in the conducted tests on a technical scale should be carried out in a laboratory of the Ordering Party or a laboratory accredited by the Ordering Party with accreditation for the tests required in the Terms of Reference and the test protocol. In order to arrange a date for conducting technical tests, you should contact Mr. Mgr Eng. Bogusław Szczęch tel. 507671503.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Inżynieryjno- Budowlane i Sieci Sanitarnych ASTEX Sądelscy spółka jawna | 5 | 2024–2025 |
| Kompostech spółka z o.o. | 2 | 2024 |
| Kamir Monika Chwajoł spółka z o.o. | 2 | 2024 |
| Piotr Mrugała Firma Budowlana Mrugała | 2 | 2025 |
| Jarosław Biela Zakład Usługowo- Produkcyjny | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.