Remont kapitalny pomp wody zasilającej wysokiego oraz niskiego ciśnienia na BGP2 oraz przegląd okresowy pomp wody zasilającej na BGP1-ECI w PGE Energia Ciepła S.A. Oddział w Gorzowie Wielkopolskim
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 13 October at 12:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 15% of this buyer's awards went to companies that had already won here before (1,622 awards since 2017, spread over 406 companies). That is well below the sector norm (45%) — this buyer switches suppliers more often than others.n = 1,622 awards since 2017
- 21% of awards went to companies from abroad (1,622 awards with a known winner country). Sector average: 2%.n = 1,622
- The median procedure drew 2 bids (1,270 procedures with a bid count); 34% ended with a single bidder. Sector: median 2 bids.n = 1,270
- 75% of the bids received came from small and medium-sized enterprises (95 procedures with a bid mix). Sector: 87%.n = 95
- Across 4 procedures with structured selection criteria, this buyer most often required: References: works (4 of 4).n = 4
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Poland · Repair & maintenance, 342 contracts went to foreign companies over the last 3 years (of 30,895 recorded awards) — mostly from Germany, France, Italy.
Submission language: POL.
Typical field: median 2 (from 246 awards).
What the buyer is looking for
Major overhaul of high and low pressure feed water pumps on BGP2 and periodic inspection of feed water pumps on BGP1-ECI in PGE Energia Ciepła S.A. Branch in Gorzów Wielkopolski
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ERBUD INDUSTRY CENTRUM Sp. z o.o. | 20 | 2020–2026 |
| ZEC SERVICE Sp. z o.o. | 13 | 2024–2026 |
| ABB Sp. z o.o. | 11 | 2022–2026 |
| Zakłady Remontowe Energetyki Katowice S.A. | 9 | 2024–2026 |
| VEGA VALVE Sp. z o.o. | 8 | 2019–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.