Przebudowa budynku Urzędu Skarbowego w Krośnie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Krośnie przy ul. Składowej 5”.
Poland · Rzeszów · how to bid here →
Your path to submission
- Deadline: 14 October at 10:00 — 11 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (47 awards, most recently September 2025) — by that rhythm the next award was due around December 2025. The last award went to ELEVTECH Grzegorz Bębenek.n = 47
- The median procedure drew 2 bids (75 procedures with a bid count); 41% ended with a single bidder. Sector: median 5 bids.n = 75
- 30% of this buyer's awards went to companies that had already won here before (287 awards since 2017, spread over 173 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 287 awards since 2017
- 3% of awards went to companies from abroad (287 awards with a known winner country). Sector average: 0%.n = 287
- Across 48 procedures with structured selection criteria, this buyer most often required: References: works (43 of 48), Staff qualifications (40 of 48), References: supplies (4 of 48), Special authorisation or membership required (4 of 48).n = 48
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
The subject of the contract are construction works related to the reconstruction of the office building of the Tax Office in Krosno at ul. Component 5. The investment task carried out includes: reconstruction of the existing building at ul. Component 5 in Krosno as regards the works covered by the building permit – Decision No 114/2024 of 15.07.2024, demolition of the C.O. chimney on plot No ewid.383/7, in accordance with the demolition permit – Decision No 113/2024 of 15.07.2024, in accordance with the documentation prepared by mgr inż. arch. Charles Bulanda. The guaranteed scope of the contract includes: within the eligible measures: insulation of external walls; warming of the ventilated flat roof; warming of the flat roof; warming of external walls near the ground; performance of moisture insulation; dismantling of existing window and door joinery; installation of new window and door…
Show full description
… joinery, in accordance with the audit guidelines, in a ‘warm assembly’ system; installation of window opening sensors; construction of a supply and exhaust mechanical ventilation system with heat recovery; installation of a ventilation unit on the roof; construction of a BMS system; reconstruction of the C.O. boiler room – dismantling of old boilers with the installation of boiler rooms and installation of new condensing boilers powered by natural gas with accessories and a flue gas evacuation system; construction of a new C.O. installation from insulated pipes with the installation of new radiators equipped with thermostatic valves; disassembly of existing air-conditioning elements (external, internal units, wiring); installation of air-conditioning systems; installation of an outdoor unit on the roof; modernisation of lighting, including replacement of luminaires with LED luminaires and replacement of cabling; construction of a photovoltaic installation; construction of a new roofing material (asphalt pavement); related finishing works (painting, plastering, restoration to the original state); external works related to the subject matter of the work (dismantling, demolition, reassembly); installation and restoration of lightning protection system; demolition of the chimney; reinforced concrete construction and restoration of the retaining wall; installation of stainless steel railings; installation of gutters and drain pipes; installation of ventilation grilles. (b) under ineligible measures: installation of assistants on the roof.
What you must prove — eligibility criteria
Zamawiający wymaga wykazania przez Wykonawcę spełniania warunków udziału w postępowaniu dotyczących zdolności technicznych lub zawodowych w zakresie doświadczenia zawodowego. Zamawiający uzna warunek udziału w postępowaniu w zakresie doświadczenia zawodowego z… ▸▾
Zamawiający wymaga wykazania przez Wykonawcę spełniania warunków udziału w postępowaniu dotyczących zdolności technicznych lub zawodowych w zakresie osób skierowanych do realizacji zamówienia publicznego. Zamawiający uzna warunek udziału w postępowaniu dotyczą… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ACORDI Dominik Ziobro | 10 | 2021–2025 |
| REMONDIS Medison Rzeszów Sp. z o.o. | 6 | 2022–2026 |
| AMW REWITA Sp. z o.o. | 5 | 2022–2026 |
| FM Integrated Solutions Sp. z o.o. | 4 | 2022–2025 |
| Krisbud Krzysztof Wiącek | 4 | 2022–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.