Dostawa materiałów do konserwacji obiektów budowlanych z branż: budowlano-wykończeniowej, elektroinstalacyjnej i oświetleniowej, hydrauliczno-sanitarnej oraz wykładzin podłogowych - VIII części
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 3 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL, POL, POL, POL, POL, POL, POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (6 awards, most recently July 2025) — by that rhythm the next award was due around October 2025. The last award went to Bronikowski Paweł PRZEDSIĘBIORSTWO HANDLOWE "SEA".n = 6
- 23% of this buyer's awards went to companies that had already won here before (222 awards since 2015, spread over 121 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 222 awards since 2015
- The median procedure drew 2 bids (108 procedures with a bid count); 39% ended with a single bidder. Sector: median 3 bids.n = 108
- 100% of the bids received came from small and medium-sized enterprises (6 procedures with a bid mix). Sector: 84%.n = 6
- 1% of the bids received came from other countries (6 procedures with a bid mix) — all bidders, not just the winners. Sector: 7%.n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Construction materials, 26 contracts went to foreign companies over the last 3 years (of 9,154 recorded awards) — mostly from Germany, Czechia, France.
Submission language: POL.
Typical field: median 1 (from 3 awards).
What the buyer is looking for
1. The subject of the contract is the supply of materials for the maintenance of construction works from the following industries: construction-finishing, electrical installation and lighting, hydraulic-sanitary and floor coverings. 2. The materials supplied must be brand new, unused and free from physical and legal defects. They must be supplied in the manufacturer's original packaging, with a label containing at least: the name and identification of the product, the identity of the producer, the place of production and the country of origin. Materials must meet the requirements of the relevant harmonised standard or have a European or national technical assessment, if required for the product. In addition, they must be authorised for marketing and use in accordance with applicable law. Each delivered product must have documentation in Polish, containing technical data and product…
Show full description
… parameters enabling verification of its compliance with the specification and specified minimum requirements. 3. The description of the subject of the contract shall include: Annexes 2 to 9 to the tender specifications (hereinafter: SWZ) under the name: Description of the subject of the contract/Price form, for each part of the contract and model contract constituting Annex 10 to the tender specification. · 1. The subject of the contract is the delivery of articles from the construction and finishing industry SET 1. 2. The description of the subject of the contract is contained in Annex 2 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the delivery of articles from the construction and finishing industry SET 2. 2. The description of the subject of the contract is contained in Annex 3 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the delivery of articles from the construction and finishing industry SET 3. 2. The description of the subject of the contract is contained in Annex 4 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the delivery of articles from the electrical installation industry. 2. The description of the subject of the contract is contained in Annex 5 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the supply of articles from the lighting industry. 2. The description of the subject of the contract is contained in Annex 6 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the supply of articles from the plumbing and sanitary industry – installation. 2. The description of the subject of the contract is contained in Annex 7 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the supply of articles from the plumbing and sanitary industry – white assembly. 2. The description of the subject of the contract is contained in Annex 8 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR. · 1. The subject of the contract is the supply of floor coverings. 2. The description of the subject of the contract is contained in Annex 9 to the ToR under the name: Description of the subject of the contract/Price form and model contract constituting Annex 10 to the ToR.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| OMEGA SERWIS TOMASZ ROŻNOWSKI | 5 | 2022–2026 |
| Grupa PK Sp. z o.o. | 3 | 2023–2025 |
| "CADABRA" TOMASZ PRZYBYŁ | 3 | 2021–2025 |
| PKP Szybka Kolej Miejska w Trójmieście Sp. z o.o | 3 | 2023–2025 |
| PKP Intercity S.A | 3 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.