SE 2.1 – Franière – Development of a Sambre crossing zone and demolition of the turning basin pier
SE 2.1 – Franière – Aménagement d’une zone de croisement de la Sambre et démolition du môle du bassin de virement
Belgium · Namur · how to bid here →
Your path to submission
- Deadline: 15 October at 10:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (32 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to AELTERMAN.n = 32
- The award came in at a median 38% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 5
- 27% of this buyer's awards went to companies that had already won here before (312 awards since 2021, spread over 223 companies). That is well above the sector norm (14%) — newcomers have a harder time here than elsewhere.n = 312 awards since 2021
- The median procedure drew 5 bids (285 procedures with a bid count); 7% ended with a single bidder. Sector: median 4 bids.n = 285
- 18% of awards went to companies from abroad (312 awards with a known winner country). Sector average: 10%.n = 312
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Belgium · Construction work, 233 contracts went to foreign companies over the last 3 years (of 2,587 recorded awards) — mostly from France, Germany, Netherlands.
Submission language: FRA.
Typical field: median 5 (from 30 awards).
What the buyer is looking for
Dans le cadre du projet de liaison Seine-Escaut en Wallonie, il est prévu la création de zones de croisement sur la Sambre pour les bateaux de Classe CEMT Va (bateaux de 110 m x 11,4 m, 2000 t), et l’adaptation des bassins de virement pour les rendre accessibles à ces bateaux. Various travaux subséquents sont également prévus.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ENTREPRISE LOUIS BAUDOIN | 8 | 2024 |
| SOCOGETRA | 6 | 2024–2025 |
| Krinkels | 5 | 2024–2026 |
| Sweco Belgium | 4 | 2023–2024 |
| TRBA | 4 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.