Modular electrical power supply system with the ability to simulate an electrical power grid, energy storage batteries and photovoltaic panels
System modułowego zasilania elektrycznego z możliwością symulacji sieci elektroenergetycznej, baterii magazynów energii oraz paneli fotowoltaicznych
Poland · Kraków · how to bid here →
Your path to submission
- Deadline: 3 November at 10:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (69 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Hexagon Metrology Sp. z o.o..n = 69
- 25% of this buyer's awards went to companies that had already won here before (577 awards since 2018, spread over 359 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 577 awards since 2018
- The median procedure drew 2 bids (135 procedures with a bid count); 43% ended with a single bidder. Sector: median 2 bids.n = 135
- Across 7 procedures with structured selection criteria, this buyer most often required: References: supplies (6 of 7), References: services (1 of 7).n = 7
- 4% of awards went to companies from abroad (577 awards with a known winner country). Sector average: 3%.n = 577
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Laboratory & optical equipment, 517 contracts went to foreign companies over the last 3 years (of 19,135 recorded awards) — mostly from Germany, France, Italy.
Submission language: POL.
Typical field: median 1 (from 6 awards).
What the buyer is looking for
Modular power supply system with the possibility of simulating the power grid, energy storage batteries and photovoltaic panels, consisting of hardware power grid simulators, bidirectional AC / DC power supplies with the possibility of simulating energy storage batteries, photovoltaic and fuel cells. Modular power supply system with the possibility of simulating the power grid, energy storage batteries and photovoltaic panels, consisting of hardware power grid simulators, bidirectional AC/DC power supplies with the possibility of simulating energy storage batteries, photovoltaic and fuel cells: a) Set consisting of two sections: one AC (hardware power grid simulators) and another DC (two-way AC/DC power supplies with the possibility of simulating batteries of energy storage, photovoltaic and fuel cells) with the possibility of simultaneous use of both sections in the full range of their…
Show full description
… functionality. 230/400Vrms +/-10%, 47÷53Hz, TN-S. c) Set-up in two 19-width rack cabinets, one for each section. Mounting height of each cabinet not more than 40U. Minimum installation height reserve of at least 6U in each cabinet for possible expansion. (d) Each section consists of cooperating modules with a power lower than the total power of the section, in order to increase reliability in the event of a single failure. Number of modules working together in each section: 4 to 10. (e) Communication links between modules within one section via fibre optic links. (f) In order to ensure full hardware-software compatibility and uniform warranty responsibility, all station modules must come from a single manufacturer. (g) Possibility for both sections (AC and DC) to work together in a closed energy circuit between the AC and DC sections. Intended three-phase short-circuit power of the mains at the connection point of the equipment: >1 MVA. (h) Equipment supplied must come directly from the manufacturer or from official distribution channels authorised by the manufacturer. The Contractor must ensure that it is possible to confirm the origin of the equipment supplied from the authorised distribution channel and to provide warranty and post-warranty service authorised by the manufacturer. (i) The warranty period is 24 months. (j) Delivery must cover all wires and accessories necessary for commissioning. Depending on the needs of the Ordering Party, it is required to support the Ordering Party in the installation and commissioning of devices without additional remuneration. A detailed description of the subject-matter of the contract is contained in the ToR.
What you must prove — eligibility criteria
Wykonawca winien wykazać, że w okresie ostatnich 3 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał należycie co najmniej jedno zamówienie: obejmujące dostawę systemu zasilającego, o warto… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Remontowo-Budowlane „REMONT” S.C. Ireneusz Czuba, Dariusz Pietrzyk | 14 | 2023–2026 |
| BDTS Sp. z o.o. | 8 | 2021–2024 |
| Zakład Systemów Komputerowych ZSK Sp. z o.o. | 6 | 2021–2023 |
| Progress Systemy Komputerowe Sp. z o.o. | 6 | 2022–2026 |
| KJMK Meble Sp. z o.o. | 6 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.