Supply of electrical energy - case reference: Z/98/PN/26
Dostawa energii elektrycznej - znak sprawy: Z/98/PN/26
Poland · Grudziądz · how to bid here →
Your path to submission
- Deadline: 5 November at 12:00 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (10 awards, most recently July 2026) — the next award is due around November 2026 by that rhythm. The last award went to MOL POLSKA Sp. z o. o..n = 10
- The median procedure drew just one bid (1,215 procedures with a bid count); 56% ended with a single bidder. Sector: median 3 bids.n = 1,215
- 36% of this buyer's awards went to companies that had already won here before (1,738 awards since 2015, spread over 679 companies). 64% went to new names.n = 1,738 awards since 2015
- 12% of awards went to companies from abroad (1,738 awards with a known winner country). Sector average: 1%.n = 1,738
- 42% of the bids received came from small and medium-sized enterprises (243 procedures with a bid mix). Sector: 64%.n = 243
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,672 recorded awards) — mostly from Spain, Germany, France.
Submission language: POL.
Typical field: median 1 (from 4 awards).
What the buyer is looking for
1. The subject of the contract is the delivery by the Contractor of electricity to the electricity consumption points of the Contracting Authority (hereinafter referred to as the EPP) indicated in Annex 6 to the ToR in accordance with the draft provisions of the contract constituting Annex 4 to this ToR. 2. The subject-matter of the contract covers all electricity consumption points and tariff groups listed in the List of electricity consumption points in Annex 6 to the ToR. 3. The forecast maximum electricity demand for the duration of the contract is 10 000 MWh. The Contracting Authority informs that in this procedure conducted under the open tender procedure, it provides for the possibility of using the procedure referred to in Art. 1 of the Public Procurement Act, the contracting authority using the above-mentioned procedure will first examine and evaluate the tenders, and then make…
Show full description
… a qualitative qualification of the economic operator whose tender was the highest rated in terms of the absence of grounds for exclusion and compliance with the conditions for participation in the procedure.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Asclepios S.A. | 27 | 2024–2026 |
| Bialmed Sp. z o.o. | 27 | 2024–2026 |
| Medtronic Poland Sp. z o.o. | 22 | 2024–2026 |
| Urtica Sp. z o.o. | 20 | 2024–2026 |
| Medan Sp. jawna Pawlak i s-ka | 17 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.