Preparation of design documentation and construction works for the elimination of the pool basin
Wykonanie dokumentacji projektowej i robót budowlanych w zakresie likwidacji niecki basenu
Poland · Katowice · how to bid here →
Your path to submission
- Deadline: 2 November at 11:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (33 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to BM Budowa Sp. z o.o..n = 33
- The median procedure drew just one bid (3,732 procedures with a bid count); 53% ended with a single bidder. Sector: median 5 bids.n = 3,732
- 31% of this buyer's awards went to companies that had already won here before (4,367 awards since 2018, spread over 1,311 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 4,367 awards since 2018
- 13% of awards went to companies from abroad (4,367 awards with a known winner country). Sector average: 0%.n = 4,367
- 60% of the bids received came from small and medium-sized enterprises (1,076 procedures with a bid mix). Sector: 84%.n = 1,076
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 3 (from 30 awards).
What the buyer is looking for
The subject of the contract is: Execution of design documentation and construction works for the liquidation of the basin basin The contracting authority does not allow for the submission of partial tenders. A detailed description of the subject of the contract is contained in Annexes 2b, 3 and 4 to the ToR.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Fresenius Kabi Polska Sp. z o.o. | 26 | 2021–2026 |
| Medtronic Poland Sp. z o.o. | 25 | 2023–2026 |
| Abbott Medical Sp. z o.o. | 23 | 2024–2026 |
| Urtica Sp.z o.o | 22 | 2021–2026 |
| Urtica Sp. z o.o. | 22 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.