Canal de l'Espierres - bank stabilization and related works
Canal de l'Espierres - stabilisation des berges et travaux annexes
Belgium · Namur · how to bid here →
Your path to submission
- Deadline: 6 November at 09:00 — 34 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (32 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to AELTERMAN.n = 32
- The award came in at a median 38% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 5
- 27% of this buyer's awards went to companies that had already won here before (312 awards since 2021, spread over 223 companies). That is well above the sector norm (14%) — newcomers have a harder time here than elsewhere.n = 312 awards since 2021
- The median procedure drew 5 bids (285 procedures with a bid count); 7% ended with a single bidder. Sector: median 4 bids.n = 285
- 18% of awards went to companies from abroad (312 awards with a known winner country). Sector average: 10%.n = 312
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Belgium · Construction work, 233 contracts went to foreign companies over the last 3 years (of 2,587 recorded awards) — mostly from France, Germany, Netherlands.
Submission language: FRA.
Typical field: median 5 (from 30 awards).
What the buyer is looking for
Certaines parties des berges du canal en rives droite et gauche se sont affaissées. And rive droite, cela a causé le déversement d'une partie du rideau de palplaches en béton et également plusieurs affaissements locaux du Ravel. Le but du marché est donc d'évacuer les structures défaillantes et/ou en voie de l'être, de les remplacer par de nouvelles structures conformes ainsi que la réfection des berges et du Ravek. Ces travaux comportent les difficultés techniques suivantes : - Travail devant être réalisé sans baisse du level d'eau dans le bief pour empêcher toute nouvelle détérioration; - Travail devant être réalisé de manière rigoureuse afin de ne pas altérer les arbres remarquables en place;
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ENTREPRISE LOUIS BAUDOIN | 8 | 2024 |
| SOCOGETRA | 6 | 2024–2025 |
| Krinkels | 5 | 2024–2026 |
| INSTITUT DE CONSEIL ET D'ETUDES EN DEVELOPPEMENT DURABLE en abrégé "ICEDD" | 4 | 2023–2025 |
| Sweco Belgium | 4 | 2023–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.