Supply of electrical energy for the needs of the Municipality of Kyustendil, in two separate lots
“Доставка на електрическа енергия за нуждите на Община Кюстендил, по две обособени позиции”
Bulgaria · гр. Кюстендил · how to bid here →
Your path to submission
- Deadline: 2 November at 23:59 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: BUL, BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (16 awards, most recently March 2026) — by that rhythm the next award was due around May 2026. The last award went to СТРУМА ПЕТРОЛ-1 ООД.n = 16
- The award came in at a median 46% of the estimated value (26 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 26
- The median procedure drew 3 bids (428 procedures with a bid count); 29% ended with a single bidder. Sector: median 1 bids.n = 428
- 55% of this buyer's awards went to companies that had already won here before (463 awards since 2017, spread over 162 companies). 45% went to new names.n = 463 awards since 2017
- 5% of awards went to companies from abroad (463 awards with a known winner country). Sector average: 0%.n = 463
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
Among 6,545 recorded awards in Bulgaria · Petroleum & fuels over 3 years, no foreign winner yet — bidding here means being a pioneer.
Submission language: BUL.
Typical field: median 2 (from 14 awards).
What the buyer is looking for
The subject of this procedure is the supply of net active electricity for the needs of the Municipality of Kyustendil, the selection of a standard balancing group coordinator, the provision of a demand forecasting service, the preparation and submission of load schedules by the balancing group coordinator, the assumption of balancing responsibility and all activities related to participation in the liberalized electricity market of the Contracting Authority. The contractor should provide a combined service - sale of electricity and payment for services "access to and transmission through the electricity transmission and/or distribution network" and "responsibility for balancing". As a “standard balancing group coordinator”, the Contractor shall assume the responsibility for balancing the Client’s facilities, include the Client as a participant (indirect member) in a standard balancing…
Show full description
… group with the Contractor as a coordinator without the Client paying a participation fee, as well as provide forecasting of the Client’s consumption, including administration of the Client’s hourly consumption schedules. On the basis of the above, a contract for combined services within the meaning of Art. 11, item 10 and under the conditions of Art. 20 of the Electricity Trading Rules / will be concluded with the Contractor. The Contractor shall comply with the provisions of the Energy Act (ZE) and its secondary legislation relating to the subject matter of the contract, as well as the orders of the Electricity System Operator, so as not to be removed from the balancing energy market. The contractor must supply the required amount of electricity within the relevant time limits, performing all necessary actions to ensure the execution of the contract. The Contractor shall provide forecasting of the consumption of the sites of the Contracting Authority and shall carry out planning and negotiation of specific quantities of electricity according to the TRE. If necessary, the Contractor should register the unregistered objects of the Contracting Authority on the electricity market and carry out the necessary actions to change the coordinator of a balancing group, in accordance with the current legislation. The subject of the contract under lot No 1 also includes the introduction of a system for remote measurement and monitoring of electricity consumption in 6 (six) selected sites / measuring points of the Contracting Authority. As a result of the site energy monitoring system: identify specific options to reduce energy consumption; The contracting authority will acquire a tool for technological modernization and will have an additional source of information about the current state of the sites, in the context of introducing solutions with an environmental effect; the ability to monitor consumption and receive different types of notifications (notifications). In the event of a change in the price for "public obligation", fees, supplements, contributions and taxes to the price of electricity, as well as the introduction of new obligations and/or components to the price of a producer and/or trader, set by the Energy and Water Regulatory Commission (EWRC) and/or by another competent authority, as well as in the event of a change in the legislation related to these issues, the parties to the contract for the award of the contract are obliged to comply with the changes, and the new obligations and/or components will be automatically added and paid in addition to the total estimated value of the contract from the date of entry into force of the change. According to the Energy Act of the Republic of Bulgaria, Chapter Nine, Section IV “Distribution of electricity”, the operator of the electricity distribution network is obliged to ensure to consumers continuity of electricity supply and quality of the supplied electricity, maintenance of the electricity distribution network, measurement of electricity in the electricity distribution network, as well as all other services related to
What you must prove — eligibility criteria
1.1. Участникът следва да е лицензиран за търговия с електрическа енергия, включително за дейността „координатор на стандартна балансираща група” съгласно чл. 39, ал. 1, т. 5 и ал. 5, т. 5 от Закона за енергетиката, а за чуждестранни лица – в аналогични регист… ▸▾
участникът следва да е постигнал положително съотношение между определени активи и пасиви, както следва: Коефициент на обща ликвидност (К ол) минимум 1,5 Участниците следва да са постигнали положително съотношение между определени активи и пасиви, а именно – м… ▸▾
участникът следва да е изпълнил минимум 1 (една) дейност с предмет и обем, идентичен или сходен с този на поръчката общо за последните 3 години, считано от датата на подаване на офертата. Под дейност с предмет и обем, идентичен или сходен с този на поръчката, … ▸▾
1.1. Участникът следва да е лицензиран за търговия с електрическа енергия, включително за дейността „координатор на стандартна балансираща група” съгласно чл. 39, ал. 1, т. 5 и ал. 5, т. 5 от Закона за енергетиката, а за чуждестранни лица – в аналогични регист… ▸▾
участникът следва да е постигнал положително съотношение между определени активи и пасиви, както следва: Коефициент на обща ликвидност (К ол) минимум 1,5 Участниците следва да са постигнали положително съотношение между определени активи и пасиви, а именно – м… ▸▾
участникът следва да е изпълнил минимум 1 (една) дейност с предмет и обем, идентичен или сходен с този на поръчката общо за последните 3 години, считано от датата на подаване на офертата. Под дейност с предмет и обем, идентичен или сходен с този на поръчката, … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| СТРОИТЕЛНА ФИРМА - РИЛА ЕООД | 30 | 2018–2026 |
| БУЛПЛАН ИНВЕСТ ООД | 24 | 2018–2025 |
| АКВА КОНСТРУКТ ГРУП ЕООД | 22 | 2025–2026 |
| СТРУМА ПЕТРОЛ-1 ООД | 14 | 2018–2026 |
| ПАРСЕК ГРУП ЕООД | 13 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.