Construction of renewable energy installation on the territory of Domaniewice municipality
„Budowa instalacji OZE na terenie gminy Domaniewice”
Poland · Domaniewice · how to bid here →
Your path to submission
- Deadline: 6 October at 10:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew just one bid (5 procedures with a bid count); 100% ended with a single bidder. Sector: median 3 bids.n = 5
- 35% of this buyer's awards went to companies that had already won here before (32 awards since 2021, spread over 19 companies). 65% went to new names.n = 32 awards since 2021
- 3% of awards went to companies from abroad (32 awards with a known winner country). Sector average: 1%.n = 32
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,672 recorded awards) — mostly from Spain, Germany, France.
Submission language: POL.
Typical field: median 3 (from 4,384 awards).
What the buyer is looking for
1. The subject of the contract is the performance of the task entitled: ‘Construction of RES installations in the municipality of Domaniewice’. The project will be implemented in a ‘design and build’ system. The subject of the contract is carried out within the framework of: Project FELD.02.05-IZ.00-0052/23 implemented under FELD.02.05 Action: Renewable energy sources under the Priority: European Funds for Green Lodz, Programme: European Funds for Łódź 2021-2027 2. The subject of the contract is the execution of design documentation and works aimed at the implementation of the investment consisting in the delivery, assembly and commissioning of: 1) PV installations in the amount of 97 pcs. with a total capacity of 0.689 MW 2) Energy storages in the amount of 97 pcs. with a total capacity of 0.623 MWh 3) Heat pumps - the number of installations 95 pcs. with a total capacity of 1.055 MW 4)…
Show full description
… Solar collectors - the number of installations 77 pcs. with a total capacity of 0.298 MW A detailed description of the subject of the contract is included in the functional and utility program, which is attached as Annex 6 to the ToR.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Drog - Bet Marcin Głuchowski | 7 | 2021–2026 |
| PreZero Service Centrum Sp. z o.o. | 4 | 2022–2025 |
| LU-KOP Łukasz Fraszczyk | 2 | 2023–2025 |
| Przedsiębiorstwo Robót Inżynieryjno Drogowych w Łowiczu Sp. z o.o. | 2 | 2022–2024 |
| DOM-ART Daniel Graszka | 2 | 2025–2026 |
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.