"Management of rainwater on the territory of Holy Trinity Park together with the reconstruction of technical infrastructure" as part of the task: Rainwater - Stage II
„Zagospodarowanie wód opadowych na terenie Parku Świętej Trójcy wraz z przebudową infrastruktury technicznej” w ramach zadania: Wody opadowe - Etap II
Poland · Zielona Góra · how to bid here →
Your path to submission
- Deadline: 5 November at 09:00 — 31 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (192 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to M&J Sp. z o.o..n = 192
- The median procedure drew 2 bids (84 procedures with a bid count); 36% ended with a single bidder. Sector: median 5 bids.n = 84
- 42% of this buyer's awards went to companies that had already won here before (419 awards since 2018, spread over 218 companies). 58% went to new names.n = 419 awards since 2018
- The award came in at a median 86% of the estimated value (42 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 42
- Across 6 procedures with structured selection criteria, this buyer most often required: Technical staff for execution (4 of 6), References: services (2 of 6), References: supplies (2 of 6), References: works (2 of 6).n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,358 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 3 (from 23 awards).
What the buyer is looking for
1. As part of the investment, it is planned to: 1) execution of construction works, notification of completion of works or obtaining an occupancy permit (if required) and commissioning of the task or effective notification of completion of construction a) Construction industry: • demolition of all elements of the paths, the edges of the paths, the small architecture and the fence of the playground. • reconstruction of park stairs in the central part of the park, • reconstruction of park paths from concrete and earth paths into paths with a surface of concrete eco-cube permeable to water, • construction of a new mineral path • planting new decorative greenery supporting biodiversity in urban areas of native origin, • care for the existing stand. • installation of new small park architecture including: - park benches with backrest and armrests - 46 pcs. - a’la chair - 2 pcs., - park…
Show full description
… loungers with armrest - 14 pcs., - multi-person park benches - 2 pcs. - baskets with a base for waste segregation, capacity. 3x 61l, - 15 pcs., - information boards of various dimensions in accordance with the documentation - 5 pcs., - bicycle racks - 5 pcs., - playground fence (zinc plated steel, powder coated) h=90 cm, approx. 75mb - fence in the nature zone (zinc-coated steel, powder-coated steel) h=45-50 cm, approx. 170mb, approx. 114 posts - basketball baskets in the place of the pitch - 2 pieces with cleaning of the pitch and repair of cavities - dendrological plaques with a description of selected species of trees, bushes and perennials - 100 pieces, b) Sanitary industry: • construction of a water supply connection with a water meter well and water supply installations - the connection must be made to the water supply, which will be rebuilt by ZWiK in accordance with Annex 2 to the SOPZ • construction of fogging curtains – 4 pcs. • construction of a street health centre – 1 c) Electrical industry: NOTE: THE IMPLEMENTATION OF LIGHTING INSTALLATIONS, CABLE CHANNISATIONS AND LPD LINING LINE FOR VISUAL MONITORING IN THE PARK SHALL NOT BE COVERED BY THE SUBJECT PROCUREMENT. 2) In connection with the agreement No DI-KZ.4125.66.2025.IC of 17 February 2025 with the Municipal Monument Conservator, the Contractor undertakes to obtain a permit from the Lubuskie Provincial Monument Conservator to carry out archaeological research at least 14 days before the commencement of construction works. 2. A detailed description of the subject-matter of the contract is contained in Annex I.2 to the ToR and in the documents referred to in point 3.4. SWZ. 3. The subject of the contract must be carried out in accordance with the design documentation and the Technical Specifications for the Execution and Acceptance of Works contained in Annex I.4 to the ToR. 4. The task is covered by funding under the project ‘Organisation of rainwater management in the city of Zielona Góra - Stage II’ under the European Funds for Infrastructure, Climate, Environment 2021-2027 programme, FENX action. 01.02 Adaptation of urban areas to climate change. Due to technical constraints, the rest of the information can be found in the procurement documents (SWZ).
What you must prove — eligibility criteria
O udzielenie zamówienia mogą ubiegać się Wykonawcy spełniający minimalne warunki udziału w postępowaniu umożliwiające ocenę zdolności Wykonawcy do należytego wykonania zamówienia, dotyczące zdolności technicznej (w zakresie doświadczenia) umożliwiającej realiz… ▸▾
O udzielenie zamówienia mogą ubiegać się Wykonawcy spełniający minimalne warunki udziału w postępowaniu umożliwiające ocenę zdolności Wykonawcy do należytego wykonania zamówienia, dotyczące zdolności zawodowej (w zakresie personelu) umożliwiającej realizację z… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Drogowe BUD-DRÓG | 17 | 2021–2026 |
| PROGAMP Paweł Ratuś | 16 | 2021–2025 |
| Zakład Remontowo-Budowlany Maciej Jakuboszczak | 12 | 2022–2026 |
| Przedsiębiorstwo Remontowo-Drogowe „CAPRI-bit“ Eugeniusz Weiss | 9 | 2021–2026 |
| Taurus Budownictwo i Usługi Jarosław Kopciuch | 8 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.