Project and construction of expressway S12 section junction Wieniawa (without junction) - junction Radom South (with junction)
Projekt i budowa drogi ekspresowej S12 odcinek węzeł Wieniawa (bez węzła) - węzeł Radom Południe (z węzłem)
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 30 October at 11:30 — 26 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (317 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Budimex S.A..n = 317
- 33% of this buyer's awards went to companies that had already won here before (1,273 awards since 2015, spread over 725 companies). 67% went to new names.n = 1,273 awards since 2015
- The median procedure drew 4 bids (942 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 942
- The award came in at a median 85% of the estimated value (114 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 114
- 5% of awards went to companies from abroad (1,273 awards with a known winner country). Sector average: 0%.n = 1,273
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 6 (from 144 awards).
What the buyer is looking for
The contract shall include in particular: 1) Design and construction of the S12 expressway on the section from the Wieniawa junction (without the junction) to the Radom Południe junction (with the ) junction on the section from about km 29+107 (according to the kilometre of the decision on environmental conditions from d. 10 January 2023 DOOŚ-WDŚOO.420.78.2021.KN.25) to km about 1+080 (according to the kilometre of the decision on environmental conditions of 19 November 2024 WOOŚ-II.420.70.2021.MBR.83) up to the boundary of the plot of municipal road DG3506603W with a cross-section of 2 carriageways with two lanes and an emergency lane, together with engineering facilities, accompanying infrastructure and traffic safety devices, i.e. preparation of technical and as-built , design documentation based on the requirements of the Contracting Authority contained in the tender specifications,…
Show full description
… 2) obtaining on behalf of and for the Contracting Authority all opinions, arrangements, permits, permits, administrative decisions necessary to design and implement the investment and operating permit, 3) carrying out works on the section from the Wieniawa junction (without the junction) from km 29+107 to km approximately 1+080 together with the Radom Południe road junction at the intersection with the existing S7 expressway and the provincial road, and in particular the following construction works must be designed and carried out: a) construction of an expressway, b) reconstruction of existing roads in terms of collision with the expressway, construction of roads other than the expressway in order to restore damaged road connections and provide access to real estate, construction of additional carriageways, c) infrastructure for pedestrians and cyclists, d) emergency crossings and exits, entrances and emergency exits to the motorway, e) technological lanes, f) engineering facilities along the expressway and on roads crossing with the expressway, g) land drainage system, including drainage devices for the road body: road ditches, rainwater sewerage, pre-treatment devices, retention tanks and others, (h) environmental protection devices, in particular: acoustic protection, passages for animals, ecological culverts with protective and guiding fence, motorway fence, greenery, anti-glare screens, i) infrastructure for the purposes of highway facilities, including: power supply and lighting networks, water supply networks, sewage treatment networks and equipment, rainwater sewerage including pre-treatment equipment and others, j) reconstruction of conflicting equipment and networks of existing infrastructure under and above ground: telecommunication and energy equipment, water supply networks, rainwater and sewage drainage, gas networks, drainage and hydrological and other equipment, k) demolition of facilities interfering with the investment, including the demolition of residential, farm and livestock buildings and associated infrastructure, l) demolition of existing surfaces, including: roadways, pavements, m) teletechnical network for the needs of the Employer, n) road lighting, o) traffic organisation, including road safety devices, temporary traffic organisation, p) Traffic Management System, q) cleaning and evacuation of existing drainage devices and receivers for effective drainage of water from the road lane, r) any works resulting from the need to connect a section to the existing communication system together with its possible reconstruction and change in traffic organisation resulting from the adopted solutions, including those resulting from the need to join the adjacent section of the expressway at the Wieniawa junction and to implement the Radom Południe road junction in connection with the existing S7 expressway and the provincial road, s) strengthening the ground and ensuring the stability of excavation slopes and embankments to an extent adapted to ground and water conditions, t) any other works that prove necessary for the design and implementation of the investment. The Ordering Party reserves the obligation of personal performance by the Contractor k
What you must prove — eligibility criteria
1. Wykonawca musi wykazać: a) Średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „Przychód netto ze sprzedaży produktów, towarów i materiałów… ▸▾
1. Wykonawca musi wskazać: Posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 48 mln PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla „przychodu” według średniego … ▸▾
1. Wykonawca musi wykazać się wiedzą i doświadczeniem, w wykonaniu (zakończeniu) w okresie ostatnich 10 lat przed upływem terminu składania ofert /wniosków o dopuszczenie do udziału w postępowaniu, a jeżeli okres prowadzenia działalności jest krótszy – w tym o… ▸▾
1. Wykonawca musi wskazać osobę, która będzie uczestniczyć w wykonywaniu zamówienia, legitymującą się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jaka zostanie jej powierzona. Wykonawca, na funkcję wymienioną poniżej, wskaże osobę, któr… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ZABERD Sp. z o.o. | 18 | 2024–2026 |
| Budimex S.A. | 17 | 2023–2026 |
| ELEKTROTIM S.A. | 14 | 2022–2024 |
| InQubator Sp. z o.o. | 11 | 2024–2026 |
| KM MANAGEMENT GROUP sp. z o.o. | 11 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.